R
September 1, 2008
7034-106E
Page 37
Mt. Vernon Pellet Stove (AE)
H. Glass Replacement
• Glass is 5mm thick high temperature heat-re-
sistant ceramic glass.
• DO NOT REPLACE with any other material.
• Alternate material may shatter and cause
injury.
WARNING
a. Swing open the face and remove the door from the
appliance by lifting the door off of the hinge pins and
lay on a flat surface face down.
b. Using a Phillips head screw driver, remove 4 screws,
2 on the top and 2 on the bottom. Remove metal
bracket and then remove the glass.
Figure 37.2.
c. Replace with new glass with gasket.
d. Re-attach metal bracket with 4 screws.
e. Re-install door over hinge pins and close face.
Remove 4 screws
Glass with Gasket
Metal Bracket
G. Combustion (Exhaust) Blower
Replacement
1. Follow the proper shut down procedures as outlined on
page 30, Section 10.A.
2. Remove the right side panel by removing the 4 screws
using a Phillips head screw driver.
Figure 37.1
.
3. It is not necessary or recommended to remove the
housing to replace or service the combustion blower.
You only need to remove the motor and impeller.
4. Disconnect the wire from the control board connection
points #1 and #8. Depress the tab on the connector to
disconnect the wire (similar to a telephone connector).
See Figure 39.1 on page 39
for the locations of #1
and #8.
5. Using an 11/32 socket or nut driver, remove the (6)
8x32 nuts securing the motor and impeller to the hous-
ing.
6. Holding the black plastic body of the motor, rotate the
impeller counter-clockwise until blades line up with
opening in the housing and remove motor and impel-
ler.
7. If the gasket between housing and motor is damaged it
will have to be replaced. A gasket is included with the
replacement blower.
8. Re-install in reverse order.
Remove (6) Nuts
Remove
Side
Panel
Figure 37.1
Figure 37.2