Pre-Delivery Check List
Check off all items as they are found satisfactory or after adjustments
are made:
1
All safety shields and guard are securely in place!
1
All decals are in place and readable!
1
Tighten all hardware – see Checking Bolt Torque in Service Section.
1
Check the drive belt is adjusted properly – see Service Section.
To help prevent personal injury
from rotating impeller or thrown
objects, never walk or stand in line
with the discharge during run-in or
operation!
CAUTION
1
Start the Quadivator Snow Thrower and allow it to run for 5 – 10 minutes, check
for excessive operation or unusual noise.
1
The Quadivator Snow Thrower has been tested and to the best of my
knowledge, is ready to be delivered to the customer!
Date Predelivered –
Signature –