background image

 

160.463UK User Manual 

 

Layout and connections 

 

 
Setting up and operation 

 
The QTFX-900 mkII requires fog fluid to produce the effect. 

It is recommended to use one of the range of qtx fog fluids for best results. 
A chart for recommended fog fluids is included further along in this document 

 

 

Unscrew the top cap of the tank and remove to fill with the selected fog fluid

 

 

Replace the cap and close securely, ensuring the pipe is fed down to the bottom of the 
bottle so a consistent flow of fluid is supplied to the machine

 

 

Select either wired or RF remote control and connect to the appropriate socket (4, 7)

 

 

Connect the IEC mains plug 

 

 

Check the fog fluid level indicator at the rear and fill if necessary 

 

Switch the mains power on 

 

Heat up time is approximately 3-6 minutes. Please ensure that the remote button is not 
pressed during the heat up time. 

 

If fluid level is empty, the heater will shut down and the Fluid Low LED will light 

 

Switch off when not in use.  

 

Unplug from mains if not in use for long periods 
 

 
 

 
 

 

1.  Fog output nozzle  

5.  Fluid low warning LED 

2.  Mounting bracket 

6.  Fluid level indicator 

3.  Fog fluid tank 

7.  RF remote control connection 

4.  Wired remote control connection 

8.  Mains inlet IEC & fuse holder 

Отзывы: