160.482UK User Manual
Front panel
Setting up
Unfasten front and rear lids of the flight case. Unscrew the top cap of the tank and
remove to fill with haze fluid. Replace the bottle and screw the cap securely, making
sure that the pipe is fed fully into the bottle to ensure a consistent flow of fluid.
If required, the rear control panel can be released and used as a wired remote
control by unfastening the 2 securing screws (already connected via a 5-pin lead)
If DMX512 is to be used for control, connect the DMX signal from the controller to
the DMX IN XLR connector. Any further DMX controlled units may be connected via
the DMX OUT XLR connector. Use 3-pin or 5-pin as required. (2, 3, 4, 5)
Connect the IEC lead supplied to a suitable outlet (1), ensuring correct voltage.
Heat up time is only 30-40 seconds before the HAZYR-PRO is ready to use.
Pull forward the output aperture (7) to direct the flow of haze to the required angle.
Ensure that this output is not obstructed and a safe distance away from people.
1 IEC mains inlet & fuse holder
2 DMX input (3-pin XLR)
3 DMX output (3-pin XLR)
4 DMX input (5-pin XLR)
5 DMX output (5-pin XLR)
6 Fluid intake (connected to fluid tank)
7 Angle adjustable haze outlet aperture
Содержание HAZYR-PRO
Страница 7: ...160 482UK User Manual...