User Manual
Chapter 2. Hardware Installation
27
www.qtech.ru
Step 2: Insert the QSW-2GB module to the guide rail inside the 10Gb module slot.
Step 3: Push the QSW-2GB module along the guide rail gently until it comes into contact with
the machine panel.
Step 4: Insert the SFP transceiver to the guide rail inside the QSW-2GB. Do not put the SFP
transceiver up-side-down.
Step 5: Push the SFP transceiver along the guide rail gently until it comes into contact with the
QSW-2GB.
Note: the 2GB extended module does not support hot swappable.
Caution!
Do not stare directly at the 2 fiber bores in the fiber transceiver when the switch is in
operation, otherwise the laser may hurt your eyes.
2.3.6
Copper Cable/Fiber Cable Connection
Copper cables should be connected as below:
Step 1: Insert one end of the Ethernet cable to the RJ-45 Ethernet port in the switch copper
cable line card;
Step 2: Insert the other end of the Ethernet cable to the RJ-45 Ethernet port of other device;
Step 3: Check all status indicators for the corresponding ports; a lighted LED indicates that the
link has been established, otherwise the link is not ready and the cable should be examined.
Caution!
Please verify the sign above the port to ensure using the right port. Connecting to wrong ports
might damage the switch.
Fiber cables should be connected as below:
Step 1: Remove the protective plug from the SFP/SFP+ fiber transceiver bore; Remove the
protective cap from one end of the fiber cable. Keep the fiber end clean and neat.
Step 2: Attach one end of the fiber cable to the SFP/SFP+ transceiver, and attach the other end
to the transceiver of the corresponding devices. Note: The SFP/SFP+ transceiver’s TX port
should be connected to the RX port of the corresponding device, and vice versa.
Step 3: Check the fiber port status indicator, a lighted LED indicates that the link has been
established; otherwise the link is not ready and should be examined.
Caution!
Содержание QSW-8200 series
Страница 1: ...USER MANUAL www qtech ru...