Installing the System Hardware
The following diagram shows that after the XCubeSAN storage receives the magic packet
being sent from the client’s computer, it powers on automatically and uses Wake-on-SAS
functionality to power-on the attached
XD5300
expansion enclosures.
Figure 3-36
Wake-on-LAN and Wake-on-SAS Technology
3.12.
Connecting a UPS
If users want to install a UPS (uninterruptible power supply) to provide clean power and also
offer protection against mains power failures, please follow the following instructions.
Before you purchase a UPS system, please check QSAN XCubeSAN series supported
UPS interfaces and communication types.
Содержание XCubeSAN XS5224D
Страница 5: ...Contents iii Appendix 121 End User License Agreement EULA 121...
Страница 20: ......
Страница 134: ...114 Copyright 2021 QSAN Technology Inc All Right Reserved Figure 7 1 Download Service Package in the SANOS UI...
Страница 138: ...118 Copyright 2021 QSAN Technology Inc All Right Reserved...