![Qlima 8713508781112 Скачать руководство пользователя страница 89](http://html1.mh-extra.com/html/qlima/8713508781112/8713508781112_installation-manual_765970089.webp)
89
12. TEST RUNNING AFTER INSTALLATION
Perform test running after completing electrical safety check and gas leak check.
The test running time should last more than 30 minutes.
Check if all the functions works well during test running. Especially check whether the drainage of indoor
unit is smooth or not.
4
Содержание 8713508781112
Страница 33: ...33 33 Corrija la orientación de la placa de instalación Figura 8 SC 4225 SC 5225 SCJA 2519 SC 4232 SC 5232 5 ...
Страница 55: ...55 55 Orientation correcte du support de montage Fig 8 SC 4225 SC 5225 SCJA 2519 SC 4232 SC 5232 3 ...
Страница 77: ...77 4 77 Correct orientation of Installation Plate Figure 8 SC 4225 SC 5225 SCJA 2519 SC 4232 SC 5232 ...
Страница 99: ...99 99 Montaggio corretto della placca di installazione Figura 8 SC 4225 SC 5225 SCJA 2519 SC 4232 SC 5232 ...
Страница 121: ...121 121 Correcte montage van installatieplaat Afbeelding 8 SC 4225 SC 5225 SCJA 2519 SC 4232 SC 5232 1 ...
Страница 143: ...143 143 Orientação correta da Placa de Instalação Figura 8 SC 4225 SC 5225 SCJA 2519 SC 4232 SC 5232 9 ...
Страница 165: ...165 165 Pravilna usmeritev plošče za namestitev Slika 8 SC 4225 SC 5225 SCJA 2519 SC 4232 SC 5232 y ...
Страница 177: ...177 y ...