QIDI I-mate Скачать руководство пользователя страница 8

4.

 Remove the protective film on 

the outside of the machine.

5.

 Cut off the cable tie on the 

right Y axis.

6.

 Cut off the cable tie on the left 

Y axis.

2.

 Take out the instructions and 

take out the foam.

Содержание I-mate

Страница 1: ...i mate This guide only applies to i mate 3D printer...

Страница 2: ...i mate...

Страница 3: ......

Страница 4: ......

Страница 5: ......

Страница 6: ......

Страница 7: ......

Страница 8: ...4 Remove the protective film on the outside of the machine 5 Cut off the cable tie on the right Y axis 6 Cut off the cable tie on the left Y axis 2 Take out the instructions and take out the foam...

Страница 9: ...8 Remove the belt fixing clip of the right Y axis 9 Remove the belt fixing clip of the left Y axis 10 Take out the foam in the di rection of the arrow 11 Move the nozzle out to the left 12 Move the no...

Страница 10: ...en the platform rises to the middle 18 The accessories in the foam at the bottom of the platform include solid glue and U disk 19 Congratulations You ve finished the unpacking process Tip Save your pr...

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ...the filament guide into the 3d printer 4 Take out the filament guide 3 Tighten the retaining screw of the retainer ring 2 Make the roll of filament through the spool holder If you newly purchased fil...

Страница 17: ...e installation is completed as shown in the picture 7 Thread the filament into the extruder If need to close the pull rod push the spring button opposite direc tion firstly then push down the pull rod...

Страница 18: ......

Страница 19: ...escribed below 1 Click Tool icon 5 Hold down the filament buckle and slowly pull out the filament 4 Click Stop icon 3 Wait for the temperature to reach 220 and then click the down icon When the filame...

Страница 20: ......

Страница 21: ......

Отзывы: