INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK_DUO-G10.X

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK_DUO-G10.X

6

7

2 Planning

2.2 Requirements

Installation Site

Please note the following guidelines that apply to the installation 

site:

 

Solar modules are not explosion-proof and are not suitable for 

use in explosive environments.

  Do not operate solar modules near highly flammable gas and 

vapors (e.g. gas tanks, gas stations).

  Do not install modules in enclosed space.

  Do not install modules in locations where they may be 

submerged in water (e.g. floodplains).

  Do not use modules as a substitute for the normal roofing (e.g. 

modules are not watertight).

  Do not install modules in close proximity to air conditioning 

systems.

  Do not install modules above 4000 m (13120 ft) altitude above 

sea level.

  Contact with saline water (e.g. spray water from the sea) and 

salt aggregation on the modules must be avoided.

  Do not bring any chemical substance (e.g. oil, solvent etc.) into 

contact with any part of the panel. Only substances, which are 

released by Qcells, are allowed to be used during installation, 

operation and maintenance.

  Any installation of modules on surfaces of water is prohibited. 

This includes installations on floating as well as pile-based 

platforms. Qcells may extend the coverage of its warranty to 

such installations, based on a case by case assessment of 

the system design and location. A prior written consent by the 

warrantor is required in any case.

The solar modules are designed for the following applications:

 

Operating temperatures from –40 °C to +85 °C 

 

(–40 °F to +185 °F).

 

Pull loads up to max. 4,000 Pa and push loads up to max. 

8,100 Pa (see chapter "Mounting options").

 

Installation using a mounting structure for solar modules.

Prevention of Shadowing Effects

Optimal solar irradiation leads to maximum energy output:

  For this reason, install the modules so that they face the sun.

  Avoid shadowing (due to objects such as buildings, chimneys 

or trees).

  Avoid partial shading (for example through overhead lines, dirt, 

snow).

Mounting Structure Requirements

The Modules shall be installed and operated on mounting 

structures that comply with any applicable laws and stipulations 

as well as with the following:

 

Conform to the necessary structural requirements.

 

Compliant with local snow and wind loads.

 

Properly fastened to the ground, the roof, or the façade.

 

Forces acting on the module are relayed to the mounting 

substructure.

 

Ensures sufficient rear ventilation of the module.

 

Avoid the usage of different metals to prevent contact 

corrosion.

 

Allows for stress-free expansion and contraction due to 

temperature fluctuations.

  Ensure that no additional forces are applied through the 

mounting system into the module except for the wind and snow 

loads. Additional forces and moments of torque at the mounting 

positions caused by torsions, displacements or vibrations in the 

mounting system are not allowed.

  Ensure that the clamps and the mounting frame are compatible.

Clamp System Recommendations

Use customary clamps that satisfy the following requirements:

 

Clamp width: ≥ 40 mm.

 

Clamp height compliant with a 32 mm frame height.

 

Clamp depth: 7-12 mm. (applicable for all CL clamping mounting 

options at section "2.3 Mounting options")

 

Clamps are not in contact with the front glass.

 

Clamps do not deform the frame.

 

Clamps that satisfy the structural requirements based on the 

conditions of the installation site according to the applicable 

regulations and technical standards.

 

Long-term stable clamps that securely affix the module to the 

mounting frame.

Module Orientation Requirements

 

Vertical or horizontal installation is permitted.

  Ensure that rain and melting snow can run off freely. No water 

accumulation.

  Ensure that the drainage holes in the frame are not covered. 

No sealing.

75°

  Maintain the permissible angle of inclination.

 

Minimum angle of inclination: 3°

 

Inclination angles above 75° may be limited by 
local regulations

  Standing water on the modules glass needs to be 

avoided.

2 Planning

2.3 Mounting options

Fig. 2:

  Installation options for crystalline Qcells modules. All dimensions are given in mm. Also observe the maximum test loads and 

clamping range as specified on the following page. 

The illustrated installation options apply for both horizontal and vertical module orientation.

Module

Clamp

Subconstruction

Mounting profile

TYPE OF

INSTALLATION

POINT MOUNTING SYSTEM

LINEAR MOUNTING SYSTEM 

Installation 

with clamps

300 - 500

EUROPE

ASIA

CL1a

20 - 650

CL1b

15 - 210

300 - 500

EUROPE

ASIA

CL1a

20 - 650

CL1b

15 - 210

CL2a

20 - 300

CL2b

20 - 300

        

CL2a

20 - 300

CL2b

20 - 200

xxx - xxxx

EUROPE

xxx - xxx

CL6b

560 - 1160

20 - 400

CL6a

EUROPE

CL6c

20 - 400

CL6d

20 - 250

560 - 1160

560 - 1160

        

EUROPE

CL6c

20 - 400

CL6d

20 - 250

560 - 1160

560 - 1160

CL3

CL4

240 - 350

200 - 350

0 - 300

0 - 300

CL3

CL4

CL4

0 - 200

ROW

CL3

200 - 350

Hybrid clamping

300 - 450

EUROPE

20 - 100

CL5

Содержание Q.PEAK DUO-G10.X Series

Страница 1: ...Installation and operation manual Q PEAK DUO G10 X solar module series...

Страница 2: ...the solar modules This manual Other applicable stipulations such as country specific regulations for pressure equipment operational safety hazardous goods and environmental protection Regulations and...

Страница 3: ...itional information see the relevant datasheet of the module provided at www qcells com PRODUCT LINE Q PEAK DUO G10 Q PEAK DUO G10 Q PEAK DUO G10 a Q PEAK DUO G10 a Q PEAK DUO BLK G10 Q PEAK DUO BLK G...

Страница 4: ...fastened to the ground the roof or the fa ade Forces acting on the module are relayed to the mounting substructure Ensures sufficient rear ventilation of the module Avoid the usage of different metals...

Страница 5: ...termination of location specific load requirements Ensure that the connection cables of the junction box do not run between laminate and mounting rails Modules bend under load Therefore sharp objects...

Страница 6: ...ulating the current measurement values ISC of conductors Sizing of control systems connected to the outlets of the solar modules Please follow the valid national guidelines for the installation of ele...

Страница 7: ...insulated tools Do not carry out the installation alone Only install undamaged modules and components Do not modify the module e g do not drill any additional holes 3 Installation 3 1 Safety and trans...

Страница 8: ...he inverter and the wiring with extreme caution Ensure that the modules are disconnected at the inverter prior to separation Be sure to observe the time intervals specified by the inverter manufacture...

Страница 9: ...e condition To avoid complex cabling arrangements it is often advantageous to rotate some modules 180 Module orientation can clearly be identified from the front side by the serial number and barcode...

Страница 10: ...Please contact an installer or Qcells Technical Customer Service Department Dispose of modules in accordance with the local disposal regulations 4 Electrical connection 4 4 After installation Ensure t...

Страница 11: ...occur Remove snow and ice carefully without force e g with a very soft broom Do not scratch off dirt Module cleaning has to be done by qualified personnel according to the state of the art and taking...

Страница 12: ...stallation manual solar modules Q PEAK_DUO G10 X_2022 06_Rev02_EN Hanwha Q CELLS GmbH OT Thalheim Sonnenallee 17 21 06766 Bitterfeld Wolfen Germany EMAIL WEB TEL FAX sales qcells com www qcells com 49...

Отзывы: