12 Energy Meter Installation
The installation of the digital energy meter must comply with the instruction provided by the energy meter
manufacturer.
Note
For information about how to connect the wires to the RS-485 connector in the inverter, see "9.3 Energy Meter
12.1 EM24, Carlo Gavazzi (Three-Phase)
1
Energy Meter Wiring
Grid (Mains)
N
L1
L2
L3
41 42
1
N
L1
L2
Utility Meter
1
L3
PV INV
Q.HOME CORE CB
Main CB
PV CB
Load CB
Critical Load CB
Main Load
Critical Load
3 4
1 2
(Optional) Secondary Energy Meter
Energy Meter
N
N
L1
L2
L3
Q.VOLT
Load
(Off-grid)
Grid
RS485_NEG RS485_POS