English
36
19
Power Off
CAUTION
If the AC circuit breaker cannot remain switched on after commissioning (e.g. because
the new meter has not yet been installed), the DC switch on the hybrid inverter must
remain switched on to avoid deep discharge of the battery. Alternatively, the device
can also be switched off completely (see “Turning off the System” in Installation
Manual).
To turn off the system:
1
Turning off the battery DC switch.
2
Turning off the PV switch.
3
Turn off the AC circuit breaker in the junction box.
Содержание Q.HOME CORE A4
Страница 1: ...INSTALLATION QUICK GUIDE Q HOME CORE H4 A4 English Fran ais Deutsch...
Страница 34: ...English 34 5 Set network 6 Check firmware update 7 Check region and time 8 Set system parameters...
Страница 40: ...English 40 MEMO...
Страница 41: ...GUIDE D INSTALLATION RAPIDE Q HOME CORE H4 A4 Fran ais...
Страница 80: ...Fran ais 80 MEMO...
Страница 81: ...INSTALLATIONS KURZANLEITUNG Q HOME CORE H4 A4 Deutsch...
Страница 114: ...Deutsch 114 5 Netzwerk einstellen 6 Auf Firmware Update pr fen 7 Region und Uhrzeit pr fen 8 Systemparameter festlegen...