background image

© 2021 Q-Tran Inc. All rights reserved | 155 Hill St. Milford, CT 06460 | 203-367-8777 | [email protected] | www.q-tran.com 

Specification subject to change. Rev-06-13-23

INSTALLATION 

LED POWER SUPPLY - QTM-eLED+DALI-DT8-AN

AN-1

AN-2

AN-1

AN-2

14.5"

4.0"

8.0"

ISO VIEW

SURFACE MOUNT

RECESSED MOUNT

Mounted in the secondary wiring compartment only

Conduit Entry Locations

Lutron Athena Node

0.875"

 KNOCKOUT 

9X

(FOR 

1/2"

 FITTINGS)

BOTTOM VIEW

4.0"

8.0"

16

 

ADDITIONAL 

SIDE 

KNOCKOUTS

14.5"

SIDE VIEW

4.0"

VERTICAL

HORIZONTAL

RECESSED MOUNT

Plenum Door Required

Horizontal

Vertical

SURFACE SPACING

SURFACE STACKING

ROD SUSPENSION

9.5" O.C.

16" O.C.

19" O.C.

9.5
" O.C.

9.5

" O.C.

More Units can be stacked

More Units can be stacked

M

or

e U

nits can be stack

ed

NOTE: 

Rods not included.

RECESSED SURFACE 

R

O

D

 S

U

S

P

E

N

S

IO

N

 

(V

e

rt

ic

a

l)

ROD SUSPENSION 

(Horizontal)

NOTE:

 

Bracket can also be mounted 

(Top & Bottom) for Vertical Mounts. 

1/4"

 

Rod  Thru Hole

3/8"

 Rod  Thru Hole

Double Sided 

Key Hole

Athena nodes must be installed on the secondary side of power supply center and require 1.0” of clearance 

in order to optimally function. Metal conduit must be 1.0” away from any node. Refer to the diagram above 

for recommendations for conduit entry into secondary compartment.

Node And Conduit Entry Locations

Mounting Options

Отзывы: