Close hole with earth.

Q-VAULT-5

STANDARD INSTALLATION 

Continued

 

• 

Install cover with Hex 

    screw by following the 
    number sequence.

NOTE

Maximum torque 50"lbs

1

2

4

5

6

3

Soil

Gravel

Drain Pipe

Soil

Gravel

Drain Pipe

• 

Install Gasket.

Housing top before placing gasket

Gasket

Soil

Gravel

Drain Pipe

1.

• 

Place drain pipe at the lowest 

    slope of land for proper 
    drainage. Fill bottom of pit with 
    4" of gravel.

16"

• 

Place housing into Hole then 

    bring all primary and secondary 
    wiring into housing.

NOTE: 

Using the Field Drill Guide 

           Labels provided in the installation 

           kit you are able to drill for various

           fitting sizes.

2.

Soil

Gravel

Soil

30"

• 

Prepare Excavated Hole:

    30" x 16".

Drain Pipe

4"

  

3.

4.

• 

Make Q-SET connection.

 

 ٭

 Q-SET1: Fits 2

  ٭

 Q-SET2: Fit 1

 

٭

 Q-SET3: Fit 1

5.

6.

7.

Soil

Gravel

Drain Pipe

Gasket

Gasket

Drain Pipe

Land

NOTE

Q-SET Installation Instruction

on separate sheet in shipping box.