INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11S.X / BFG

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11S.X / BFG

22

23

4  Electrical connection

4.4 After installation

  Ensure that all necessary safety and functional tests 

have been carried out according to applicable stan-
dards.

Note! Module damage may occur!

  Ensure that the plug connections are secured away 

from any water-channelling surface. 

  Integrate the system into the existing lightening 

protection system in accordance with the applicable 
local regulations.

Warning! Fire Risk!

  Do not use light concentrators (e.g. mirrors or lenses).

  Ensure that the cabling is not exposed and / or hang-

ing and is protected from dirt, moisture and mechani-
cal friction.

5  Grounding

Protective Grounding

In order to prevent electrical shock or fire, the frame of the mod-
ule as well as any non-current-carrying metal parts of the system 
must be grounded. While this section provides some informa-
tion about grounding the Qcells frames and modules, reference 
should be made to local statutes and regulations for specific 
requirements on grounding. The U.S. National Electrical Code ad-
dresses these issues in Article 250. A module with exposed con-
ductive parts is considered to be in compliance with this standard 
only when it is either electrically grounded in accordance with the 
manufacturer’s instructions and the requirements of the National 
Electrical Code, ANSI/NFPA 70 (2014-2017), or when the bonding 
means has been evaluated with this module to UL 2703.

Proper grounding is achieved by bonding all exposed non-cur-
rentcarrying metal equipment to the appropriately sized equip-
ment grounding conductor (EGC) or racking system that can be 
used for integrated grounding.

Qcells frames are protected from corrosion with an anodized 
coating, which has to be penetrated in order to ensure proper 
bonding. The different methods listed below are suggested 
methods for an appropriate bond between the frame and the 
EGC or racking system (that will have to be properly grounded). 
The method appropriate for any individual installation will depend 
on multiple factors.

 

Dimensions shown are in inches.

0.177” (+0.008/-0)

±0.08

0.79”

0.47”

±

0.08

Option A: Use of a grounding lug

A listed grounding lug can be bonded to the frame using the 
grounding holes pre-drilled in the frame. These holes are marked 
with a ground symbol, as shown below on the frame section 
drawing: To install the grounding lug, follow the specified instruc-
tions of the manufacturer. The grounding lug should be made of 
stainless steel or tin plated metals such as aluminum to avoid cor-
rosion.

The grounding lug should be attached to the frame grounding 
hole using a stainless steel screw, toothed lock washer or KEPS 
nut (in order to penetrate the anodized layer) and backing nut. 
Care should be taken to avoid the use of grounding hardware of 
dissimilar metals, which may lead to corrosion.

Option B: Integrated grounding methods

The Qcells modules can be bonded with the racking system us-
ing UL1703 or UL2703 certified integrated grounding methods. 
The racking system will then have to be grounded so that the 
overall system is properly grounded. The listed racking system 
and grounding device should be installed in accordance with 
the manufacturers’ instructions. An example of such integrated 
grounding method is the use of a WEEB clip or Schletter plate 
between the module and the racking system, when mounting the 
module.

The WEEB washers are generally compatible with Qcells mod-
ules, however each combination module / racking system requires 
a specific WEEB washer size. Note that WEEB clips are intended 
for single use only; they must not be reused after removal or 
loosening. Refer to Wiley’s installation instructions for the specific 
use of WEEB washers.

An example of such integrated grounding method is the use of a 
washer recognized as meeting UL2703 requirements between 
the module and the racking system, when mounting the module. 
For example, WEEB washers are generally compatible with Qcells 
modules, however each combination module / racking system 
requires a specific WEEB washer size. Note that WEEB washers 
are intended for single use only; they must not be reused after 
removal or loosening. Refer to Wiley’s installation instructions for 
the specific use of WEEB washers.

PV Laminate

Backing Nut (Stainless Steel)

Toothed Lock Washer (Stainless 
Steel)

Grounding Lug (Stainless Steel 
or tin-plated metal)

Equipment 
Grounding 
Conductor

Aluminum 
Frame

Screw (Stainless Steel)

Содержание Q.PEAK DUO XL-G11S /BFG Series

Страница 1: ...Installation and operation manual Q PEAK DUO XL G11S X BFG solar module series...

Страница 2: ...ator are responsible for com pliance with all applicable statutory requirements and regulations The following regulations and standards must be upheld at all times during the installation operation an...

Страница 3: ...AGE THIS INCLUDES IMPROPER IN STALLATION OR CONFIGURATION IMPROPER MAINTENANCE UNINTENDED USE AND UNAUTHORIZED MODIFICATION Attention This marking indicates that this product should not be disposed of...

Страница 4: ...Installation using a mounting structure for solar modules Mounting Structure Requirements Requirements for the mounting structure Conform to the necessary structural requirements Compliant with local...

Страница 5: ...sult from the safety factor 1 5 Mounting options with clamps The illustrated installation options apply for both horizontal and vertical module orientation Module Clamp Mounting rail 4 CLAMPS ON LONG...

Страница 6: ...same material properties Distance between outer edge of module and middle of the clamp 2 Planning 2 3 Mounting options Tracker mounting options Module Bolt Mounting rail TRACKER INSTALLATION USING 15...

Страница 7: ...clear ance between the bottom module plane level of bottom frame leg and closest substructure element below solar module lam inate The minimum clearance is defined by the maximum test push load and t...

Страница 8: ...gulations when designing the system It has to be ensured that the maximum system voltage including all necessary safety margins is not exceeded Take the voltage limit of the inverter into account when...

Страница 9: ...connection cables or junction box Carry modules upright and horizontally as shown Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any ob...

Страница 10: ...out work on the inverter and the wiring with extreme cau tion Ensure that the modules are disconnected at the inverter prior to separation Be sure to observe the time intervals specified by the invert...

Страница 11: ...ectrical work may only be performed by qualified and skilled personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of...

Страница 12: ...n inches 0 1 7 7 0 0 0 8 0 0 08 0 79 0 47 0 08 Option A Use of a grounding lug A listed grounding lug can be bonded to the frame using the grounding holes pre drilled in the frame These holes are mark...

Страница 13: ...installation area alone or without taking ade quate security precautions Please commission a trade specialist NOTE Module surface damage may occur Remove snow and ice carefully without force e g with...

Страница 14: ...nstallation manual solar modules Q PEAK DUO XL G11S X BFG_modules_series_2023 10_Rev05_NA HANWHA Q CELLS AMERICA INC 400 Spectrum Center Drive Suite 1400 Irvine CA 92618 USA EMAIL WEB TEL hqc inquiry...

Отзывы: