INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11.X / BFG – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11.X / BFG – Q CELLS

2  PLANNING

2  PLANNING

2.3  MOUNTING OPTIONS

2.3  MOUNTING OPTIONS

Specifications

MODULE TYPE

MOUNTING
OPTION

POSITION OF 
CLAMPS* [MM]

TEST LOAD 
PUSH / PULL**  [PA] 

DESIGN LOAD 
PUSH / PULL**  [PA] 

SAFETY 
FACTOR

Q.PEAK DUO XL-G11.3 / BFG

Q.PEAK DUO XL-G11.7 / BFG

CL1a 

400 - 550

3600 / 2400

2400 / 1600

1.5

CL3 

400 - 550

FB1

508

5400 / 2400

3600 / 1600

FB2

508

3600 / 2400

2400 / 1600

TB1b

813

2700 / 2400

1800 / 1600

TB2b

outer clamps: 813
inside clamps:
508 or 813

 

Ä

The below mounting options are only possible under certain conditions.

MODULE TYPE

MOUNTING 
OPTION

POSITION OF 
CLAMPS* [MM]

TEST LOAD 
PUSH / PULL*** 
[PA] 

DESIGN LOAD 
PUSH / PULL*** 
[PA] 

SAFETY 
FACTOR

Q.PEAK DUO XL-G11.3 / BFG

Q.PEAK DUO XL-G11.7 / BFG

TB1a

1008

1600 / 1600

1060 / 1060

1.5

 TB2a

outer clamps: 1008
inside clamps:
508 or 813 or 1008

2100 / 1800

1400 / 1200

*
** 
***

Distance between outer edge of module and middle of the clamp (see table „2.3 Mounting Options“ on page 7); consider further details below. 
Loads according to IEC 61215-2:2016. 
Test procedure according to IEC 61215-2:2016. Loads for these mounting options do not fulfill the requirements of the standards.

MOIUNTING
OPTIONS

REQUIREMENTS

All

 

Ä

The loads in the table are related to the mechanical stability of the solar modules. The mechanical stability of 
the mounting system including clamps has to be evaluated by the system supplier. The listed test load values 
have been determined with the following clamp parameters: clamp width = 40 mm and clamp depth = 10 
mm.

 

Ä

The system installer is responsible for the determination of location-specific load requirements.

 

Ä

Ensure that the connection cables of the junction box do not run between laminate and mounting rails.

 

Ä

Modules bend under load. Therefore, sharp objects (e.g. screws, ballast stones, rail ends, rails with burrs or 
sharp corners) must not be placed near the module backside so as not to touch the laminate under load.

 

Ä

Ensure that the junction boxes do not touch the mounting structure (e.g. shorts rails, ballast, etc.) or the 
rooftop under load. Clamps or insertion profiles etc. must not touch the glass (even under load).

 

Ä

Unbalanced loads (e.g. snow overhangs, snowdrifts) which result in locally significantly increased loads must 
be removed or avoided by technical measures.

 

Ä

A minimum support depth of 15 mm is required on the back side of the module.

CL1a, CL3,

FB1, FB2

 

Ä

Ensure that module frame is fixed directly on the rail of the substructure (no spacer allowed between the 
module and substructure).

CL1a, FB1

 

Ä

These mounting options are not recommended as mounting rails will cast shade on the module rear side. 

FB1, FB2,

TB1a, TB1b, 

TB2a TB2b

 

Ä

Use M8 corrosion-proof screws and washers (diameter ≥ 15.8 mm) for mounting slots (Detail A, Fig.1) and M6 
corrosion-proof screws and washers or bobtails for tracker slots (diameter ≥ 13 mm or 0.51 in; Detail B, Fig. 1). 
Mounting screws and washers should have the same material properties.

TB2a, TB2b

 

Ä

Mounting rails need to extend beyond the middle of mounting holes by at least 17 mm.

Specifications for TB1a, TB1b, TB2a and TB2b Mounting Options

100

257

257

100

100

120

160

160

Limited area 1 [mm]

Limited area 2 [mm]

CLEARANCE [mm]

TES

T L

O

A

 [P

a]

Limited Area 1

Limited Area 2

5

10

15

20

25

30

35

40

45

200

600

400

800

1000

1200

1400

1600

1800

2000

2200

2400

2600

2800

50

55

60

65

TB1a, 
TB2a

Limited Area 1

Limited Area 2

TB1b, TB2b

TB1a, TB2a

Fig. 3: 

Definition of limited areas. 

Fig. 4: 

Push loads in relation to minimum clearance between 
frame bottom edge and substructure. 

NOTE

For a requested push load maintain a minimum distance (clearance) 
between the bottom module plane (level of bottom frame leg) 
and closest substructure element below solar module laminate. 
The minimum clearance is defined by the maximum test push load 
and the limited area where the substructure element is located 
beneath the module (see figure 3 and 4).

Содержание Q.PEAK DUO XL-G11.X / BFG Series

Страница 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO XL G11 X BFG solar module series Valid for Africa Europe LatinAmerica South America...

Страница 2: ...ations such as country specific regulations for pressure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable la...

Страница 3: ...mitrequirements prior to installation of the solar power system Other applicable documents In addition to this Manual following technical information are relevant DOCUMENT TYPE Product data sheet Pack...

Страница 4: ...requirements Compliant with local snow and wind loads Properly fastened to the ground the roof or the fa ade Forces acting on the module are relayed to the mounting substructure Ensures sufficient re...

Страница 5: ...ast stones rail ends rails with burrs or sharp corners must not be placed near the module backside so as not to touch the laminate under load Ensure that the junction boxes do not touch the mounting s...

Страница 6: ...les in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ensure that the maximum reverse current...

Страница 7: ...hown Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Danger Ris...

Страница 8: ...t in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire open circuit voltage is active even at low levels of solar irradiati...

Страница 9: ...skilled personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type and manufacturer Use minimum 4mm2 copp...

Страница 10: ...R INSTALLATION Protective Grounding The modules must be grounded in accordance with the local statutory regulations DANGER Risk of fatal injury due to electric shock Do not attempt to fix any problems...

Страница 11: ...ace damage may occur Remove snow and ice carefully without force e g with a very soft broom Do not scratch off dirt Module cleaning has to be done by qualified personnel according to the state of the...

Страница 12: ...nual solar modules Q PEAK DUO XL G11 X BFG_2022 01_Rev01_AU HANWHA Q CELLS AUSTRALIA PTY LTD Suite 1 Level 1 15 Blue Street North Sydney NSW 2060 Australia TEL 61 0 2 9016 3033 FAX 61 0 2 9016 3032 EM...

Отзывы: