INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.X – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.X – Q CELLS

Installation Site

Please note the following guidelines that apply to the installation site:

• 

Solar modules are not explosion-proof and are not suitable for 
use in explosive environments.

 

Ä

Do not operate solar modules near highly flammable gas and 
vapors (e.g. gas tanks, gas stations).

 

Ä

Do not install modules in enclosed space.

 

Ä

Do not install modules in locations where they may be submerged 
in water (e.g. floodplains).

 

Ä

Do not use modules as a substitute for the normal roofing (e.g. 
modules are not watertight).

 

Ä

Do not install modules in close proximity to air conditioning 
systems.

 

Ä

Do not install modules above 13,120 ft (4,000 m) altitude above 
sea level.

 

Ä

Contact with saline water (e.g. spray water from the sea) and 
salt aggregation on the modules must be avoided.

 

Ä

Do not bring any chemical substance (e.g. oil, solvent etc.) into 
contact with any part of the panel. Only substances, which are 
released by Q CELLS, are allowed to be used during installation, 
operation and maintenance.

 

Ä

Any installation of modules on surfaces of water is prohibited. 
This includes installations on floating as well as pile-based 
platforms. Q CELLS may extend the coverage of its warranty 
to such installations, based on a case by case assessment of 
the system design and location. A prior written consent by the 
warrantor is required in any case.

Prevention of Shadowing Effects

Optimal solar irradiation leads to maximum energy output:

 

Ä

For this reason, install the modules so that they face the sun. 

 

Ä

Avoid shadowing (due to objects such as buildings, chimneys 
or trees).

 

Ä

Avoid partial shading (for example through overhead lines, 
dirt, snow).

Limitations

The solar modules are designed for the following applications:

• 

Operating temperatures from –40 °F to +185 °F. 

• 

Pull loads and push loads according to chapter 2.3 (‘Test Load’ 
in accordance with IEC 61215 and ‘Design Load ×1.5’ in accor-
dance with UL 61730).

• 

Installation using a mounting structure for solar modules.

Mounting Structure Requirements

Requirements for the mounting structure:

• 

Conform to the necessary structural requirements.

• 

Compliant with local snow and wind loads.

• 

Properly fastened to the ground, the roof, or the façade. 

• 

Forces acting on the module are relayed to the mounting sub-
structure.

• 

Ensures sufficient rear ventilation of the module. 

• 

Avoid the usage of different metals to prevent contact corrosion.

• 

Allows for stress-free expansion and contraction due to tem-
perature fluctuations.

 

Ä

Ensure that no additional forces are applied through the mounting 
system into the module except for the wind and snow loads. 
Additional forces and moments of torque at the mounting 
positions caused by torsions, displacements or vibrations in 
the mounting system are not allowed.

 

Ä

Ensure that the clamps and the mounting frame are compatible.

Clamp System Recommendations

Use customary clamps that satisfy the following requirements:

• 

Clamp  width:  ≥ 1.5 in  (38 mm).

• 

Clamp height compliant with a 1.26 in (32 mm) frame height.

• 

Clamp depth: 0.28-0.47 in (7-12 mm). (applicable for all CL 
clamping mounting options at section „2.3 Mounting Options“)

• 

Clamps are not in contact with the front glass.

• 

Clamps do not deform the frame.

• 

Clamps that satisfy the structural requirements based on the 
conditions of the installation site according to the applicable 
regulations and technical standards.

• 

Long-term stable clamps that securely affix the module to the 
mounting frame.

Module Orientation Requirements

• 

Vertical or horizontal installation is permitted.

 

Ä

Ensure that rain and melting snow can run off freely. No water 
accumulation.

 

Ä

Ensure that the drainage holes in the frame are not covered. 
No sealing.

75°

 

Ä

Maintain the permissible angle of inclination.

• 

Minimum angle of inclination: 3°

• 

Inclination angles above 75° may be limited by 
local regulations

 

Ä

Standing water on the modules glass needs to be 
avoided.

2  PLANNING

2.2  REQUIREMENTS

Fig. 2: 

Installation options for crystalline Q CELLS modules. All dimensions are given in inch (mm in brackets). Also observe 
the maximum test loads and clamping range as specified on the following page.  
The illustrated installation options apply for both horizontal and vertical module orientation. 

 

Module 

Clamp 

Subconstruction 

Mounting profile

TYPE OF 
INSTALLATION

MODULE

POINT MOUNTING SYSTEM

LINEAR MOUNTING SYSTEM

INSTALLATION 
WITH CLAMPS

Q.PEAK DUO ML-G9
Q.PEAK DUO ML-G9+
Q.PEAK DUO BLK ML-G9
Q.PEAK DUO BLK ML-G9+

HYBRID  
CLAMPING

Q.PEAK DUO ML-G9
Q.PEAK DUO ML-G9+
Q.PEAK DUO BLK ML-G9
Q.PEAK DUO BLK ML-G9+

INSTALLATION  
ON MOUNTING  
POINTS

Q.PEAK DUO ML-G9
Q.PEAK DUO ML-G9+
Q.PEAK DUO BLK ML-G9
Q.PEAK DUO BLK ML-G9+

INSTALLATION 
WITH INSERTION 
PROFILES

Q.PEAK DUO ML-G9
Q.PEAK DUO ML-G9+
Q.PEAK DUO BLK ML-G9
Q.PEAK DUO BLK ML-G9+

NOT PERMITTED

2  PLANNING

2.3  MOUNTING OPTIONS

IP1

IP2

IP1

IP2

IP1

IP2

IP1

IP2

11.8 - 17.7

(300 - 450)

NA

3.94 - 9.84 

(100 - 250)

CL5

28.4 - 44.1
(720 - 1120)

NA

3.94 - 9.84
(100 - 250)

CL6b

720 - 1120

150 - 350

CL6a

CL2a

0.79 - 11.8

(20 - 300)

CL2b

0.79 - 11.8

(20 - 300)

CL2a

0.79 - 11.8

(20 - 300)

CL2b

0.79 - 11.8

(20 - 300)

0.79 - 21.7

(20 - 550)

5.91 - 17.7

(150 - 450)

North 
America

0.79 - 21.7

(20 - 550)

CL1a

CL1b

0.59 - 8.27

(15 - 210)

0.79 - 21.7

(20 - 550)

5.91 - 17.7

(150 - 450)

North 
America

0.79 - 21.7

(20 - 550)

CL1a

CL1b

0.59 - 8.27

(15 - 210)

CL3

CL4

0 - 11.8

(0 - 300)

9.84 - 17.7

(250 - 450)

7.87 - 13.8

(200 - 350)

North 
America

CL3

CL4

0 - 11.8

(0 - 300)

NA

4 × mounting 
slots

14.8

(376)

FB2

4 x mounting 
slots

NA

14.8
(376)

FB1

Содержание Q.PEAK DUO ML-G9 Plus

Страница 1: ...Valid for North America INSTALLATION AND OPERATION MANUAL Q PEAK DUO ML G9 X solar module series...

Страница 2: ...pliance with all applicable statutory requirements and regulations The following regulations and standards must be upheld at all times during the installation operation and maintenance of the solar m...

Страница 3: ...r applicable documents This installation manual is only valid in combination with the following technical information DOCUMENT TYPE Product data sheet Packaging and transport information MISUSE OR INC...

Страница 4: ...hemounting system into the module except for the wind and snow loads Additional forces and moments of torque at the mounting positions caused by torsions displacements or vibrations in the mounting sy...

Страница 5: ...ystem supplier The Q CELLS listed test load values were determined with the following clamp parameters clamp width 1 5in 38mm and clamp depth 0 39in 10mm The system installer is responsible for the de...

Страница 6: ...g the maximum number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ensure that...

Страница 7: ...NOTE Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT DANGER Risk of...

Страница 8: ...arcs may result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the ent...

Страница 9: ...sonnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type and manufacturer Use minimum No 12 AWG copper wir...

Страница 10: ...holes are marked with a ground symbol as shown below on the frame section drawing To install the grounding lug follow the specified instructions of the manufacturer The grounding lug should be made o...

Страница 11: ...to be checked that the components are secure undamaged and clean Cleaning WARNING Risk of injury due to hot and live modules Only clean modules that have cooled down Do not carry or wear any electric...

Страница 12: ...Spectrum Center Drive Suite 1400 Irvine CA 92618 USA TEL 1 949 748 59 69 EMAIL inquiry us q cells com WEB www q cells us Subject to change without notice Q CELLS Installation manual solar modules Q PE...

Отзывы: