18
19
INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.4 – Q CELLS
INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.4 – Q CELLS
18
Ä
Ensure that all necessary safety and functional
tests have been carried out according to
applicable standards.
Note! Module damage may occur!
Ä
Ensure that the plug connections are secured
away from any water-channelling surface.
Ä
Integrate the system into the existing lightening
protection system in accordance with the
applicable local regulations.
Warning! Fire Risk!
Ä
Do not use light concentrators (e.g. mirrors or
lenses).
Ä
Ensure that the cabling is not exposed and / or
hanging and is protected from dirt, moisture
and mechanical friction.
4 ELECTRICAL CONNECTION
4.4 AFTER INSTALLATION
Ä
No dry cleaning or use of rotating brushes.
Ä
Modules must be cleaned manually and only
with sufficient water.
Protective Grounding
Ä
The modules must be grounded in accordance with the local
statutory regulations.
DANGER!
Risk of fatal injury due to electric shock!
Ä
Do not attempt to fix any problems yourself (e.g., glass cracks,
damaged cables).
Ä
Please contact an installer or Q CELLS Technical Customer
Service Department.
Ä
Do not disconnect modules by yourself.
Ä
Please contact an installer or Q CELLS Technical Customer
Service Department.
Ä
Dispose of modules in accordance with the local disposal
regulations.
5 GROUNDING
6 FAULTS AND DEFECTS
7 DISPOSAL