Q CELLS Q.PEAK DUO-G10 Series Скачать руководство пользователя страница 10

18

19

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO-G10.X – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO-G10.X – Q CELLS

18

 

Ä

Ensure that all necessary safety and functional 
tests have been carried out according to 
applicable standards.

Note! Module damage may occur!

 

Ä

Ensure that the plug connections are secured 
away from any water-channelling surface. 

 

Ä

Integrate the system into the existing lightening 
protection system in accordance with the 
applicable local regulations.

Warning! Fire Risk!

 

Ä

Do not use light concentrators (e.g. mirrors or 
lenses).

 

Ä

Ensure that the cabling is not exposed and / or 
hanging and is protected from dirt, moisture 
and mechanical friction.

4  ELECTRICAL CONNECTION

4.4 AFTER INSTALLATION

Protective Grounding

 

Ä

The modules must be grounded in accordance with the local 
statutory regulations.

DANGER! 
Risk of fatal injury due to electric shock!

 

Ä

Do not attempt to fix any problems yourself (e.g., glass cracks, 
damaged cables).

 

Ä

Please contact an installer or Q CELLS Technical Customer 
Service Department.

 

Ä

Do not disconnect modules by yourself.

 

Ä

Please contact an installer or Q CELLS Technical Customer 
Service Department.

 

Ä

Dispose of modules in accordance with the local disposal 
regulations.

5  GROUNDING

6  FAULTS AND DEFECTS

7  DISPOSAL

Содержание Q.PEAK DUO-G10 Series

Страница 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO G10 X solar module series Valid for Africa Europe LatinAmerica South America...

Страница 2: ...y hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable laws and requirements in particular inter national country specific regional laws and...

Страница 3: ...are relevant DOCUMENT TYPE Product data sheet Packaging and transport information External dimensions and components for Q PEAK DUO G10 Q PEAK DUO G10 Q PEAK DUO G10 a Q PEAK DUO G10 a Q PEAK DUO G10...

Страница 4: ...orces acting on the module are relayed to the mounting substructure Ensures sufficient rear ventilation of the module Avoid the usage of different metals to prevent contact corrosion Allows for stress...

Страница 5: ...qui rements Ensure that the connection cables of the junction box do not run between laminate and mounting rails Modules bend under load Therefore sharp objects e g screws ballast stones rail ends rai...

Страница 6: ...nce of reverse currents caused by module defects ground leaks or defective insulation Ensure that the maximum reverse current load capacity indicated in the data sheet is met In order to limit reverse...

Страница 7: ...te Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Danger Risk of fa...

Страница 8: ...fe threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire open circuit voltage is active even at low levels of solar irradiation Plea...

Страница 9: ...personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type and manufacturer Use minimum 4mm2 copper wire...

Страница 10: ...ht concentrators e g mirrors or lenses Ensure that the cabling is not exposed and or hanging and is protected from dirt moisture and mechanical friction 4 ELECTRICAL CONNECTION 4 4 AFTER INSTALLATION...

Страница 11: ...age may occur Remove snow and ice carefully without force e g with a very soft broom Do not scratch off dirt Module cleaning has to be done by qualified personnel according to the state of the art and...

Страница 12: ...ee 17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL sales q cells com WEB www q cells com Subject to change without notice Q CELLS Installation manual solar...

Отзывы: