background image

20

21

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.MAXX-G3 – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.MAXX-G3 – Q CELLS

20

Q CELLS solar modules are known for a long operating life and 
minimal maintenance effort and expense. Dirt and grime are 
usually washed away by rain. If the module is fully or partially 
shaded by dirt or debris (e.g., plants, bird droppings), it needs 
to be cleaned to prevent a loss of performance.

Maintenance

 

Ä

The PV system has to be inspected regularly by certified 
personnel

 

Ä

The time intervals and extent of the inspection can depend on 
local circumstances (e.g. salt, ammonia content in the air, high 
humidity etc.). The customer / operator must inform himself 
about time intervals and extend of necessary inspections.

 

Ä

Inspections have to be performed especially after extraordinary 
events (e.g. storm, hail, high snow loads etc.)

 

Ä

During the inspections it has to be checked that the compo-
nents are secure, undamaged and clean

Cleaning

WARNING! 
Risk of injury due to hot and live modules!

 

Ä

Only clean modules that have cooled down.

 

Ä

Do not carry or wear any electrically conductive parts.

WARNING! 
Risk of falling due to unsecured access! 

 

Ä

Never access the installation area alone or without taking 
adequate security precautions.

 

Ä

Please commission a trade specialist.

NOTE! 
Module surface damage may occur! 

 

Ä

Remove snow and ice carefully without force (e.g. with a 
very soft broom).

 

Ä

Do not scratch off dirt.

 

Ä

Rinse dirt (dust, leaves, etc.) off with lukewarm water or use, 
only for the glass surface, an alcohol-based glass cleaner. 
Do not use abrasive detergents or surfactants for any part 
of the panel.

 

Ä

Use a soft cellulose cloth (kitchen roll) or sponge to carefully 
wipe off stubborn dirt. Do not use micro fleece wool or 
cotton cloths.

Isopropyl alcohol (IPA) can be used selectively to remove 
stubborn dirt and stains within one hour after emergence.

 

Ä

Please follow the safety guidelines provided by the IPA 
manufacturer.

 

Ä

Do not let IPA run down between the module and the frame 
or into the module edges.

Note! Module damage may occur!

 

Ä

Do not clean modules with water if there is a 
risk of frost.

8  MAINTENANCE AND CLEANING

 

Ä

Free the substructure from any dirt and debris 
(leaves, bird nests, etc.).

 

Ä

Remove dirt with lukewarm water or alcohol-
based glass cleaner, a broom, or a soft cloth.

 

Ä

Do not use surfactants, rotating brushes, 
scrapers, or any high-pressure water cleaning 
equipment.

Содержание Q.MAXX-G3 Series

Страница 1: ...INSTALLATION AND OPERATION MANUAL Q MAXX G3 solar module series Valid for Africa Europe LatinAmerica South America DRAFT...

Страница 2: ...such as country specific regulations for pressure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable laws and...

Страница 3: ...or solar power systems Please be sure to contact the relevant local authorities and energyprovidersregardingregulationsandpermitrequirements prior to installation of the solar power system Other appli...

Страница 4: ...g substructure Ensures sufficient rear ventilation of the module Avoid the usage of different metals to prevent contact corrosion Allows for stress free expansion and contraction due to temperature fl...

Страница 5: ...The system installer is responsible for the determination of location specific load requirements CL1a at high loads 5400 4000Pa The clamp position is variable in the given range but the distance betwe...

Страница 6: ...maged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ensure that the maximum reverse current load capacity indicated in the data sheet is met In or...

Страница 7: ...le damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Danger Risk of fatal inj...

Страница 8: ...m the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire open circuit vol...

Страница 9: ...nel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type and manufacturer Use minimum 4mm2 copper wires insul...

Страница 10: ...nical friction Ensure that cables are protected from abrasion tension compression and cutting forces in full accordance with AS NZS 3000 and all other relevant standards 4 ELECTRICAL CONNECTION 4 4 AF...

Страница 11: ...y conductive parts WARNING Risk of falling due to unsecured access Never access the installation area alone or without taking adequate security precautions Please commission a trade specialist NOTE Mo...

Страница 12: ...n manual solar modules Q MAXX G3_2020 11_Rev01_AU HANWHA Q CELLS AUSTRALIA PTY LTD Suite 1 Level 1 15 Blue Street North Sydney NSW 2060 Australia TEL 61 0 2 9016 3033 FAX 61 0 2 9016 3032 EMAIL q cell...

Отзывы: