AA
DD
WWW.PYLEX.COM
STEP • ÉTAPE
STEP • ÉTAPE
12
20
19
ON THE STRUCTURE,
INSTALL THE
"E" PIECES
SUR LA STRUCTURE,
INSTALLER LES
PIÈCES "E"
ON EACH SIDE PLACE 3
"AA" SCREWS PER BOARD
METTRE 3 VIS "AA"
PAR PLANCHE
DE CHAQUE CÔTÉ
1
2"
2"
46½"
THESE MEASUREMENTS ARE APPROXIMATE
PLEASE MEASURE THE DISTANCE BETWEEN SIDE A AND SIDE B
CETTE MESURE EST APPROXIMATIVE
VEUILLEZ MESURER LA DISTANCE ENTRE LE CÔTÉ A ET LE CÔTÉ B
NOUS VOUS SUGGÉRONS DE PRÉ-PERCER
AVANT D’UTILISER LES VIS TIRE-FOND - MÊCHE ⅛"
WE SUGGEST YOU TO PRE-DRILL
BEFORE USING BOTTOM SCREWS - ⅛ " BIT
BOARD SIZES
COUPE DES PLANCHES
ATTACH THE SWING
FIXER LA BALANÇOIRE
C
C
Содержание 12085
Страница 16: ...CUTTING GUIDE GUIDE DE COUPE ...