
Nixie Tube Clock ‘Nixie QTC-Four’
Issue 1 (1 December 2019)
www.pvelectronics.co.uk
- 12 -
Continue to mount C1, C2, L1, J1 and FUSE. C1 and C2 are
polarized. The longer lead goes in the hole marked ‘+’.
4.2
Testing Low Voltage Power Supply.
Identify the test GND and 5V test points as shown below.
Plug in the power supply, and then test using a DC voltmeter:
Touch the black probe on the GND test point and the red probe on
the 5V test point. The voltage should measure between 5.4 and 5.8
Volts. If not, disconnect power and check your work. Do not
proceed with the assembly until the error is corrected. Once the test
is completed, disconnect the power.
IF YOU CHOOSE TO PROCEED BEYOND THIS POINT WITHOUT
GETTING THE CORRECT VOLTAGE, WE WILL NOT BE ABLE TO
OFFER SUPPORT
Содержание Nixie QTC-Four
Страница 17: ...Nixie Tube Clock Nixie QTC Four Issue 1 1 December 2019 www pvelectronics co uk 17 ...
Страница 43: ...Nixie Tube Clock Nixie QTC Four Issue 1 1 December 2019 www pvelectronics co uk 43 12 CIRCUIT DIAGRAM ...
Страница 44: ...Nixie Tube Clock Nixie QTC Four Issue 1 1 December 2019 www pvelectronics co uk 44 ...