manualshive.com logo in svg
background image

Install the Fixture to Monorail Connector

A

FAST JACK
HOUSING

1

FAST JACK
HOUSING
CONNECTOR

FAST JACK
FIXTURE
CONNECTOR

2

2

MONORAIL

1:

 Place the Fast Jack housing onto the Monorail and use 

    fingers to tighten the Fast Jack housing connector to the Fast 
    Jack housing. 

Make sure that the Fast Jack housing 

    connector is not cross threaded.

2:

 Use fingers to tighten the Fast Jack fixture connector into the 

    Fast Jack housing connector.

B

FAST JACK
HOUSING
CONNECTOR

FAST JACK 
HOUSING

1

FAST JACK
FIXTURE
CONNECTOR

2

2

MONORAIL 2
CIRCUIT

Installation Instructions for 

Piston

SAVE THESE INSTRUCTIONS!

- This instruction shows a typical installation.
- This product is intended to be used with PureEdge Lighting 
  Monorail and Fast Jack systems only.

IMPORTANT INFORMATION

1718 W. Fullerton Chicago, IL 60614
Ph: 773.770.1195 ● Fax: 773.935.5613
www.PureEdgeLighting.com ● [email protected]
© 2016 PureEdge Lighting. All Rights Reserved. 

Doc # 904-FJ-PST_02

FJ-PST-__

Install the Fixture to Monorail 2 Circuit Connector

1:

 Place the Fast Jack housing onto the Monorail 2 Circuit and 

    use finger to tighten the Fast Jack housing connector to the 
    Fast Jack housing. 

Make sure that the Fast Jack 

    housing connector is not cross threaded.

2:

 Use fingers to tighten the Fast Jack fixture connector into 

    the Fast Jack housing connector.

1

Отзывы: