
13
Pure Cold ICON6 Installation, Maintenance Manual 2022 | Issue Date: May 2022 REV 3
Prior to placing fixtures position place-
ment to wall, locate threaded leveling
bolts along the bottom rear of the case.
Finger wind the leveling bolts downward
to the floor as close as possible. Once a
rear feet have been deployed, position
case into final position. (If multi fixture
line
-
up, aways start with endcap).
Fixtures are fitted with permanent castors for pushing fixtures into final position. Leveling Bolts should
be wound down upon final positioning of fixture with 24mm open end wrench
Icon Fixtures
have been pro-
vided with permanent-
ly mounted wheels to
easily move them into
position. This design
means that by Rule,
this is a mobile Appli-
ance; No Mechanical
Permits are required
prior to Installation.
Continue to front of case
and wind down both
front leveling bolts. Ad-
just all leveling bolts
(front and rear) to level
case using a bubble spirit
level and 24MM open
wrench.
Содержание 1OS7LA1
Страница 1: ...1 Pure Cold ICON6 Installation Maintenance Manual 2022 Issue Date May 2022 REV 3 Purecold Incorporated...
Страница 2: ...2 Pure Cold ICON6 Installation Maintenance Manual 2022 Issue Date May 2022 REV 3...
Страница 5: ...5 Pure Cold ICON6 Installation Maintenance Manual 2022 Issue Date May 2022 REV 3...
Страница 22: ...22 Pure Cold ICON6 Installation Maintenance Manual 2022 Issue Date May 2022 REV 3 16MM Wrench...
Страница 26: ...26 Pure Cold ICON6 Installation Maintenance Manual 2022 Issue Date May 2022 REV 3...
Страница 27: ...27 Pure Cold ICON6 Installation Maintenance Manual 2022 Issue Date May 2022 REV 3 Seismic Brackets Location...
Страница 29: ...29 Pure Cold ICON6 Installation Maintenance Manual 2022 Issue Date May 2022 REV 3...