8
DBI Cell Installation
(Optional)
1. Unplug the unit’s power cord from
the outlet.
←
←
←
2. Remove the Knurled Thumb Nuts and
unit from the duct.
3. Remove one (1) screw holding
the cell on the rear of the Ballast
Housing, beneath the Molex
connector.
4. Place the Hook-end of the DBI Cell
Mounting Bracket over the back of
the PCO Cell, with the screw hole
overlapping the open screw hole of
the Ballast Housing.
NOTE: Do not cover the open cell sides.
5. Replace the screw to hold the DBI
Cell Mounting Bracket in place.
6. Place the DBI Cells by lining up to
tabs and inserting them into the DBI
Cell Socket. Rotate 90° to lock them
into place.
7. Plug the Cable from the DBI Cells
to the connector on the rear of
the Ballast Housing.
8. Replace the Unit, rotating and
aligning the holes and posts, and
fasten the Knurled Thumb Nuts.
←
←
←