background image

4

       

1.1 

     1.2   

   1.3a  

   1.3b 

1.4a 

     1.4b  

  1.5            

1.6 

         1.7   

   1.8 

L  

 N 

Содержание ED6100-LED

Страница 1: ...1 INSTALLATION MAINTENANCE INSTRUCTIONS 01 2016 ED6100 LED...

Страница 2: ...fety when operating this product When handling operating or carrying out maintenance on this product personnel must employ safe engineering practices and observe all local health safety requirements r...

Страница 3: ...ed The use of a ball valve is advisable The use of a venting line may be required 1 4b Side inlet connection Connect the outlet to an Oil Water separator We advise to use the nipple supplied with your...

Страница 4: ...4 1 1 1 2 1 3a 1 3b 1 4a 1 4b 1 5 1 6 1 7 1 8 L N...

Страница 5: ...le Connector screw 2x Screw gasket 2x Connector 2x Connector gasket 2x Electronics compartment with attached Earth cable Sensor module screw 4x Sensor module Sensor module O ring small Sensor module O...

Страница 6: ...move the cap from the alarm connector to connect the alarm cables to the connector as shown below Caution is required as you may be working with hazardous voltages 2 Connect the cable to your alarm de...

Страница 7: ...pe is not sufficient or if any other flow problem occurs a venting line must be installed to prevent an air lock Do not narrow the feed pipe when installing additional adapters or piping these may cau...

Страница 8: ...warning AC Flashing Alarm cycle and alarm output activated The unit has purged more than the AC set value times without pause Unit works as normal Check why the alarm cycle has been activated and rese...

Страница 9: ...G ACTION TO BE TAKEN Default Settings Resets all settings to factory settings Press the button to select Anti Air lock setting Each X hours the unit will purge regardless of the condensate level Use t...

Страница 10: ...Closed alarm relay output Use the or buttons to choose NO or NC contacts NC default DO NOT CHANGE 1 default Sensing time setting When the condensate has reached a pre defined level the unit will wait...

Страница 11: ...no debris left in the other parts of the drain 2 7 Use a 10mm Allen key to remove the plug and strainer Clean the strainer thoroughly Replace the strainer and plug using a 10mm Allen key 2 8 Reassemb...

Страница 12: ...12 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 2 10 2 11 2 12...

Страница 13: ...top and 7 5 1 5 cm side 1 2 BSP or NPT 4 3 top and 2 9 0 6 side Outlet connection height 1 4 BSP 1 5 cm side 1 4 BSP 0 6 side Valve seals FPM Supply voltage options 230VAC or 115VAC or 24VAC or 24VDC...

Страница 14: ...14 SERVICE CHART Date Description Name...

Страница 15: ...15 DIMENSIONS mm...

Отзывы: