Pure n Natural Systems FM22 H.E.P.A. Скачать руководство пользователя страница 2

 

INSTALLATION OF MODEL FM22 

FOR  

SOLID CEILINGS 

 
 

1.

 

Remove the system from the shipping container and remove all 3 filters, including 
HEPA filter and HEPA bar at exit end. 

 
2.

 

After deciding location and direction of air flow, locate the studs between which 
the unit will be positioned. 

 

3.

 

Mark out the area where the ceiling will be cut. (Min. 47” x 22-½”) 

 

4.

 

Remove the piece of ceiling that has been cut, and remove all screws, nails, etc. 
from the cut out area. 

 

5.

 

At this time, locate an electrical source from above the cut out area, and plug in 
the unit. 

 

6.

 

Remove service door and screws that hold the door frame. Also remove 
adjustable exit louver. 

 

7.

 

Raise unit into the ceiling. (Leave the unit protruding from the ceiling depending 
on the thickness of molding that you are using to frame around unit.) 

 

8.

 

At this time, from inside the unit, affix (screw) unit to studs. Position the screws 
as close to the top of the studs as possible. This will make the removal of the 
adjustable exit louver easier. We suggest the use of 1-½” to 2” Phillips pan head 
screws and fender washers for stability. We also suggest that you use 2 screws in 
each quadrant for support. 

 

9.

 

Replace service door frame to unit, install Pre Filter and Carbon Filters, and clip 
on the service door. At opposite end of unit, install the H.E.P.A. Filter and 
H.E.P.A. bar. Replace the adjustable exit louver. 

 

10.

 

Frame unit in with your choice of material. (See #7) 

 
 
 

For any questions, please contact our customer service department at 

1-800-237-9199

 
 
 

Отзывы: