Pre

-

Startup Checklist

 

 

Pre

-

Startup Checklist

 

  

 

Before  starting  the  “ERDDR”  PURE  Humidifier  Co.  Electric  Humidifier,  check  the  following  installation 

 

items:

 

  

______

 

1.

 

  MOUNTING 

-

  Verify  that  the  humidifier  evaporating  chamber  is  securely  supported  and  that  the 

 

evaporating chamber is level in both directions.  If humidifier is installed above equipment or not located 

 

near a floor drain than a drain pan should be installed below the humidifier steam generator.

 

  

______

 

2.

 

 

 

INJECTION TUBE 

-

 Verify that the humidifier injection tube is mounted within the duct with the proper 

 

pitch back to the humidifier (2”/5 cm per foot / 31 cm).  NOTE: If the humidifier evaporating chamber or 

 

the flexible hose (optional) is mounted higher than the injection tube, a drain “tee” is required to drain the 

 

condensate out of the injection tube steam line.  If it is an Insty

-

Pac or Fast

-

Pac, refer to the 

 

respective 

 

O&M to determine if they are mounted properly and have the proper p

-

trap size.

 

 

______

 

3.

 

 

 

ELECTRICAL 

-

  Verify  that  all  wiring  connections  have  been  connected  in  accordance  with  the  wiring 

 

diagram.  

CAUTION: Live power may exist in the control cabinet.  Turn off the main power at the 

 

disconnect switch before verifying the electrical connections!

 

 

______ 4. 

 

SAFETY  CONTROLS  –  The  supply  air  duct  RH  high

-

limit  should  be  installed  at  least  10  feet 

 

downstream  from  the  humidifier  tube.    Any  other  control  sensors  should  be  at  least  10  feet 

 

downstream  from  the  humidifier  tube.    Smoke  detectors  should  not  be  installed  downstream  of  the 

 

humidifier  tube.    If  a  smoke  detector  absolutely  has  to  be  installed  downstream  from  the  humidifier 

 

tubes then it should be installed as far from the tubes as possible.

 

  

_____

 

5.

  

PIPING: Water Supply 

-

 Verify that all piping connections have been completed as recommended and 

 

that  water  pressure  is  available  to  the  humidifier.    Verify  that  the  supply  water  pressure  is  35

-

50  psi. 

 

There should be at least 5 feet of metal pipe and check valve between the tank and any plastic pipe.

 

 

_____

 

6. 

 

PIPING:  Steam  Outlet 

-

  Refer  to  attachment  for  proper  outlet  steam  piping  from  the  generator  to  the 

 

tube(s).   

Any horizontal to vertical up transition in the outlet steam pipe requires a water

-

sealed 

 

drip leg!  

Improper outlet steam piping will cause steam to leak from the steam generator.  Runs over 

 

20 feet long may require upsizing of the steam pipe.

 

Signature:__________________________  Date:_________

 

Содержание ERDDR Series

Страница 1: ...ter ERDDR Series Electric Humidifier Installation Instructions Operation and Maintenance Manual READ AND SAVE THESE INSTRUCTIONS Form No ERDOM 10 19 Our results are comforting PURE HUMIDIFIER and INTAC are registered trademarks of PURE Humidifier Co ...

Страница 2: ...alified HVAC and electrical contractors and must be in compliance with local state federal and governing codes If installed improperly this product may cause damage to property severe personal injury or death as a result of electric shock burns and or fire Do not adjust any components inside humidifier control box without consulting the factory For indoor use only unless supplied with an Outdoor E...

Страница 3: ...tput Capacity KW Humidifier Reservoir Weight Empty Full lbs hr kg hr lbs kg lbs kg ERDDR 1 3 1 4 1 42 19 70 31 4 ERDDR 3 9 4 1 3 42 19 70 31 4 ERDDR 5 15 6 8 5 42 19 70 31 4 ERDDR 6 18 8 2 6 42 19 70 31 4 ERDDR 7 21 9 5 7 42 19 70 31 4 Standard Water Unit Model No Unit KW 120V 208V 240V 480V 600V No of Heaters Heater KW Control Circuit Voltage ERDDR 1 1 8 3 4 8 4 2 2 1 1 7 1 1 0 24 vac ERDDR 3 3 2...

Страница 4: ...cal Control Box Top View Drain Valve Right Side View Front View 1 1 2 Ø Steam Outlet Connection 1 4 NPT Fill Inlet Connection 3 4 NPT Drain Connection 9 375 23 8 7 375 18 7 16 75 42 5 12 375 31 4 14 625 37 1 11 00 27 9 16 50 41 9 ...

Страница 5: ...rflow Outlet Humidifier Reservoir Immersion Heaters Drain Valve 1 4 NPT Fill Inlet Connection SCR Relay Heat Sink SCR Control Module Water Float Fill Valve Assembly Controls Cover Reservoir Cover Cover Gasket Low Water Float Switch ...

Страница 6: ...ntative High Limit Humidistat PURE Humidifier Co recommends the use of a duct high limit humidistat to prevent humidifier operation when the duct humidity level exceeds 85 relative humidity Humidifier operation above 85 relative humidity can result in over saturation of the air stream High limit humidistats are available as optional equipment from your PURE Humidifier Co representative The high li...

Страница 7: ...ter sensitive area PURE Humidifier Co recommends the addition of a drain pan under the humidifier and under the injection tube The drain pan should extend past all edges of the humidifier and if installed in the duct it should extend a minimum of 3 feet 91 cm downstream from the injection tube The pan should be capable of draining at a rate of 3 gpm The pan should be drained to a sanitary drain Dr...

Страница 8: ... clock position The hose connects to the injection tube and humidifier with stainless steel hose clamps by PURE Humidifier Co Galvanized steel duct plates are provided to seal the opening where the tube enters the duct Δ Typical ERDDR Series Electric Humidifier 3 4 SW Condensate drain line by others Δ Minimum water seal of 2 plus duct static pressure The water seal height may have to be increased ...

Страница 9: ...up water line within 5 feet of humidifier fill valve connection If plastic pipe is used beyond this point a check valve is required to prevent steam from entering the plastic section in the event that the water treatment system runs out of water Cold or hot deionized demineralized or reverse osmosis water can be supplied to the humidifier A minimum water pressure of 35 psi 2 4 Bar should be mainta...

Страница 10: ...f the humidifier If this visible steam comes in contact with any solid object walls beams machinery etc it may form condensate and drip Refer to Fig 3 and Table 4 Table 4 is located on page 10 for data on visible steam travel This will aid you in planning the location of the Blower Pack Remote Mounting The Blower Pack can be remote mounted up to ten feet away from the ERDDR humidifier see Fig 2 Bl...

Страница 11: ...e steam discharge Rise is the vertical distance the visible steam travels from the steam discharge Objects in the direct line of the visible steam or objects that are cooler than the ambient temperature may accumulate condensation Note Data above based on 70 F room temperature 296 435 CFM Fan 120 1 60 2 17 amps 1 15 HP 17 7 3 4 Table 4 Left Side View Front View Optional Blower Pack Dimensions Fig ...

Страница 12: ... may exist in the control cabinet Turn off the main power at the disconnect switch before verifying the electrical connections ______ 4 SAFETY CONTROLS The supply air duct RH high limit should be installed at least 10 feet downstream from the humidifier tube Any other control sensors should be at least 10 feet downstream from the humidifier tube Smoke detectors should not be installed downstream o...

Страница 13: ... heater s should energize on a call from the humidistat ______ 10 Check operation of optional field installed safety switches airflow proving switch high limit humidistat etc to make sure that they turn the power off to the control circuit power The safety switches should shut off the humidifier contactor whenever one or more of the optional safety switches create an open circuit ______ 11 Check h...

Страница 14: ...move the heater assembly and remove mineral deposits from floor of the humidifier reservoir Inspect for cracks or leaks It is normal for the hose to become hard and develop a set Replace as needed Cleaning Instructions Normally ERDDR reservoirs do not need to be cleaned when fed with high purity water If fed with low purity water reservoir cleaning may be needed The tank should be cleaned manually...

Страница 15: ...onger than required this will ensure proper fit when the cover is clamped back on Slide the gasket onto lip of tank around the entire perimeter and seal the ends together with a small amount of silicone Plan View of Humidifier Section View of Gasket Gasket Bottom Notch here Bottom View of Gasket Notch gasket bottom only Gasket Top DO NOT NOTCH ...

Страница 16: ...e Check transformer output Verify voltage across terminals 9 hot and 10 comm Verify that all safety controls are completing the safety circuit The level control circuit has interference or is damaged Mineral on low water float switch may be preventing the switch from opening on low water condition Consult factory if you are unsure of the source of the problem Verify voltage to and from humidity se...

Страница 17: ...er Tool Requirements Torgue List Torque List Cover Bolts 18 inch pounds MAX Hose Cuff Screws 35 40 inch pounds MAX when hot Heater Nut 18 20 foot pounds Heater Electrical Terminal 35 inch pounds Use a pliers to hold heater sheath from twisting Cover Heater Fiber Gasket Heater Nut Electrical Terminal Nuts Metal Washer Heating Element Sheath Isolator Heater Assembly Sectional Detail ...

Страница 18: ...17 Maintenance Notes Maintenance Notes Maintenance Performed Date By ...

Страница 19: ...18 Maintenance Notes Maintenance Notes Maintenance Performed Date By ...

Страница 20: ...19 ...

Страница 21: ...mbly 09079 1 15 DDR Low Water Float Switch 15048 1 16 1 4 NPT Stainless Steel Coupling 07018 1 17 Overtemp Protection Switch 15047 1 18a TCM 188 12118 A 18b MPS 387 12112 A 19 Heater Contactor 12017 1 20 Primary Fuse Holder A A 21 Primary Fuse A 2 22 SCR Relay A 1 23 SCR Heat Sink A 1 24 Secondary Fuse Holder 12085 1 25 Secondary Fuse 12063 1 26 Step Down Transformer A 1 27 Time Delay Relay 12022 ...

Страница 22: ...18 ...

Страница 23: ......

Страница 24: ...products The Seller reserves the right to make reasonable changes in products specifications and performance of any kind without notice or liability The Seller also reserves the right to deliver revised designs or models of products against any order unless this right is specifically waived in writing by the Seller The Seller shall have no responsibility whatsoever with respect to changes made by ...

Отзывы: