Pure Fitness 8642AB Скачать руководство пользователя страница 7

7

8642AB

12

13

13

14

9

Parts:

 

Part 12 (x1) - Frame Bolt M10 

Part 13 (x2) - M10 Washer 

Part 14 (x1) - Frame Bolt Nut M10

The bottom opening is assigned for the 

M10 Bolt. Tighten all parts to secure both 

frames together.

NOTE:

 

Do not over tighten the M10 bolt to the 

frames. This can scratch the product and 

make it difficult to store away/fold the 

product away.

Place the Lock Pin (9) on the upper opening 

between both frames. The button at the end 

of the Lock Pin must pass both openings to 

safely secure it.

Make sure Lock Pin is in place and will not 

move while in use. Failure to do so may 

result in injury or damage to the product.

ASSEMBLY INSTRUCTIONS

STEP 5

STEP 4

Содержание 8642AB

Страница 1: ...DEL 8642AB PRODUCT MANUAL VERSION 5 20 01 FOR AGES 13 1 X WEIGHT LIMIT 250Lbs 113Kgs TO BUILD TOOLS NEEDED CUSTOMER SERVICE GQBrands com CustomerService GQBrands com 1 866 498 5269 4401 Samuell Blvd S...

Страница 2: ...e products are not covered by the product warranty No other warranty beyond that specifically set forth above is authorized by GQBrands GLOBAL QUALITY BRANDS IS NOT RESPONSIBLE OR LIABLE FOR INDIRECT...

Страница 3: ...ular age and or physical condition IF YOU EXPERIENCE any pain or tightness in your chest irregular heartbeats shortness of breath faintness dizziness or other unusual discomfort while exercising STOP...

Страница 4: ...Pin Foam Rollers 2 3 4 10 11 6 7 Back Frame Ankle Support Attachment Backrest Cushion Cushion Bolts M8 15mm 1 Round Caps M8 Washer 2 Square End caps 14 15 16 x1 x4 x4 x1 x1 x2 x4 x4 x2 x1 x2 Frame Bo...

Страница 5: ...ings to the openings of the Backrest Cushion Tighten with 4x Cushion Bolts M8 10 and 4x M8 Washers 11 on all openings 4 2 11 11 10 10 11 11 10 10 15 3 1 Place the Ankle Support Attachment 3 on a desir...

Страница 6: ...com GQBrands com 1 866 498 5269 Align both the Assembled Base Frame and the assembled Back Frame so the upper portions meet Align the upper openings of both frames ASSEMBLY INSTRUCTIONS STEP 3 LockPin...

Страница 7: ...hten the M10 bolt to the frames This can scratch the product and make it difficult to store away fold the product away Place the Lock Pin 9 on the upper opening between both frames The button at the e...

Страница 8: ...Service GQBrands com GQBrands com 1 866 498 5269 ASSEMBLY INSTRUCTIONS 5 5 5 5 Place all 4x Foam Rollers 5 on the arms of the Ankle Support Attachment and the Arms at the top of the frame where they m...

Страница 9: ...regimen remove the Lock Pin from the upper openings in the frames NOTE Keep this Lock pin for future use to secure the product in place for each workout Fold t as shown into the Back Frame Store away...

Страница 10: ...eplacement parts at www purefun net Question I had a part missing from my box or something was damaged during assembly can you send it to me Answer If it has been 30 days or less from the date of your...

Отзывы: