Pump House PH-2L Скачать руководство пользователя страница 2

COMMISSIONING & MAINTENANCE

1.  Before servicing the pump, disconnect the electric power at the fuse box.
2.  Upon  commissioning,  check  for  debris  in  the  drain  pan.  Remove  any

material that might block the drain line or drain into the pump tank.

3.  It is recommended that the pump be checked every six months for proper

operation.  Most  important  is  to  check  for  debris  blocking  the  pump

discharge adapter/check valve. Check for proper free movement of pump

float  (Figure  3)  and  switch  and  check  for  free,  unrestricted  movement  of

motor and fan.

4.  Clean  the  holding  tank  and  float  with  warm  water  and  mild  soap.    Rinse

completely when finished.

5.  Check the inlet and outlet piping. Clean as necessary. Be sure there are no

kinks in the outlet line that would inhibit or restrict flow.

TESTING

1. Turn on power.
2. Remove motor/tank cover assembly and hold level.
3. Test motor switch by raising motor switch float with finger (Figure 3). Motor

should turn on just before float contacts underneath side of cover.

4. Replace motor/tank cover assembly on tank.

2

Figure 3.

ITEM

P/N

Description 

QTY

1

14940690 Tank

1

2

154411

Tank, Cover

1

3

154493

Motor,Plate,Volute , Assy

1

4

14940097 Cover, Motor

1

5

154715

Check Valve

1

6

154452

Float Arm

1

7

154471

Sw itch Holder

1

8

951089

Wiring Harness A

ssy, 

230V, 6FT.

1

9

902414

Tapping Screw

5

10

950337

Sw itch

1

11

929602

Drain Hole Plug

2

12

154455

Float Pivot Pin

1

13

951941

Lead Wire Assy

1

14

154037

1/4" ID Tubing Adaptor (Not Show n)

1

Motor Switch Float

Form 998389 — 09/2006

Figure 4.

Отзывы: