
5.1
Preliminary Checks
5.1.1
Checking the Chassis
Nameplate
Verify that the proper dc supply voltage and
module options are on the chassis nameplate.
Also, check for narrow, wide, or extra wide band;
Phase Comparison or Directional Comparison (2-
or 3-Frequency).
Check to ensure that all required modules are
supplied and are installed in the proper chassis
slots. The slots are labeled on the top edge of the
chassis.
5.1.2
Inspecting for the Correct dc
Voltage
With the power “OFF,” remove the Power Supply
module and inspect it for the correct dc voltage, as
specified in Table 5-1.
5.2
TCF–10B Preliminary
Connections
1. Refer to the Block Diagram (see Chapter 7,
Signal Path) for keying and output connec-
tions.
2. Connect the dc supply to the appropriate
terminals on the Rear Panel (see Figures 3-1
and 3-4, in Chapter 3, Installation).
3. Terminate the Transmitter output with a non-
inductive 50 ohm, 25 W resistor.
4. Connect the Selective Level Meter (Rycom
6021A) across the 50 ohm resistor load.
You may perform the TCF–10B acceptance tests at your installation to determine that the TCF–10B is
operational. (See Test Equipment in Chapter 4, and Signal Path in Chapter 7.)
If the TCF–10B is a Transmitter (only) set, perform the following segments: 5.1, 5.2, 5.3, and 5.4. If the
TCF–10B is a Receiver (only) set, perform segments 5.1, 5.2, 5.5, and 5.6. If the TCF–10B is a Transceiver
set, perform segments 5.1, 5.2, and 5.7.
Copyright © 1997 Pulsar Technologies, Inc.
Chapter 5. Acceptance Tests
5
!
CAUTION
ALWAYS TURN “OFF” DC POWER WHENEVER
REMOVING OR INSTALLING MODULES.
NOTE
Perform Steps 3 and 4 only if the chassis
contains a transmitter.
Specified Group
48 V
with Alarm Relay
G01
125 V
with Alarm Relay
G02
250 V
with Alarm Relay
G03
48 V
w/o Alarm Relay
G04
125 V
w/o Alarm Relay
G05
250 V
w/o Alarm Relay
G06
Table 5–1. Voltage Specifications.
Содержание TCF-10B
Страница 2: ......
Страница 19: ...Figure 1 1 TCF 10B Transceiver Set 1355D19 Sheet 1 of 4 April 1997 Page 1 5 Chapter 1 Product Description 1 ...
Страница 21: ...April 1997 Page 1 7 Chapter 1 Product Description 1 Figure 1 3 TCF 10B Receiver Only Set 1355D19 Sheet 3 of 4 ...
Страница 32: ...Page 1 18 April 1997 TCF 10B System Manual Technologies Inc USER NOTES ...
Страница 49: ...December 1996 Foigure 2 15 TCF 10B Catalog Numbers Module Style Numbers 1355D19 Page 2 17 ...
Страница 53: ...Page 3 4 April 1997 TCF 10B System Manual Technologies Inc Figure 3 2 Cable Termination Diagram 9651A13 ...
Страница 57: ...Page 3 8 April 1997 TCF 10B System Manual Technologies Inc USER NOTES ...
Страница 58: ...April 1997 Figure 3 3 TC 10B TCF 10B Mechanical Outline Drawing 1354D48 Page 3 9 ...
Страница 59: ...Page 3 10 Figure 3 4 TCF 10B Connection Drawing and Jumper Options 2064D87 Sheet 1 of 2 April 1997 ...
Страница 60: ...April 1997 Figure 3 5 TCF 10B Connection Drawing and Jumper Options 2064D87 Sheet 2 of 2 Page 3 11 ...
Страница 62: ...Page 4 2 January 1996 TCF 10B System Manual Technologies Inc Figure 4 1 Extender Board ...
Страница 88: ...Page 6 12 April 1997 TCF 10B System Manual Technologies Inc 8 RECEIVER LOGIC ...
Страница 89: ...April 1997 Page 6 13 Chapter 6 Routine Adjustment Procedures 6 ...
Страница 95: ...April 1997 Figure 7 1 TCF 10B Functional Block Diagram 1354D13 Page 7 5 ...
Страница 103: ...Page 9 4 January 1996 TCF 10B System Manual Technologies Inc Figure 9 2 TC 10B TCF 10B Power Supply Schematic 1617C39 ...
Страница 110: ...January 1996 Page 10 5 Chapter 10 Keying Module 10 Figure 10 1 TCF 10B Keying PC Board 1606C50S ...
Страница 112: ...January 1996 Page 10 7 Chapter 10 Keying Module 10 Figure 10 3 TCF 10B Keying Schematic 1606C50 ...
Страница 117: ...Page 10 12 January 1996 TCF 10B System Manual Technologies Inc USER NOTES ...
Страница 122: ...April 1997 Page 11 5 Chapter 11 Transmitter Module 11 Figure 11 1 TC 10B TCF 10B Transmitter PC Board 1500B10 ...
Страница 123: ...Page 11 6 Figure 11 2 TCF 10B Transmitter Schematic 1355D71 April 1997 ...
Страница 124: ...April 1997 Page 11 7 Chapter 11 Transmitter Module 11 Figure 11 2 TCF 10B Transmitter Block Diagram 1610C09 ...
Страница 129: ...Page 11 12 April 1997 TCF 10B System Manual Technologies Inc USER NOTES ...
Страница 132: ...January 1996 Page 12 3 Chapter 12 10W PA Module 12 Figure 12 1 TC 10B TCF 10B 10W PA PC Board 1495B73 Sheet 5 of 7 ...
Страница 133: ...Page 12 4 January 1996 TCF 10B System Manual Technologies Inc Figure 12 2 10W PA Schematic 1606C33 ...
Страница 143: ...Page 13 6 April 1997 TCF 10B System Manual Technologies Inc USER NOTES ...
Страница 167: ...Page 14 24 April 1996 TCF 10B System Manual Technologies Inc USER NOTES ...
Страница 188: ...16 Chapter 16 Receiver Logic Module April 1997 Page 16 7 Figure 16 7 Phase Comparison Functional Block Diagram ...
Страница 189: ...April 1997 Figure 16 7 2 Frequency Directional Comparison Functional Block Diagram Page 16 7 ...
Страница 190: ...Page 16 8 Figure 16 8 3 Frequency Directional Comparison Functional Block Diagram April 1997 ...
Страница 204: ...April 1997 Figure 16 11 TCF 10B Receiver Logic Schematic CF30RXLMN Sheet 1 of 3 Page 16 21 ...
Страница 205: ...Page 16 22 Figure 16 12 TCF 10B Receiver Logic Schematic CF30RXLMN Sheet 2 of 3 April 1997 ...
Страница 206: ...April 1997 Figure 16 13 TCF 10B Receiver Logic Schematic CF30RXLMN Sheet 3 of 3 Page 16 23 ...
Страница 214: ...Page 17 8 January 1996 TCF 10B System Manual Technologies Inc USER NOTES ...
Страница 220: ...Page 18 6 April 1997 TCF 10B System Manual Technologies Inc Figure 18 1 TC 10B TCF 10B Voice Adapter PC Board 1495B79 ...
Страница 223: ...April 1997 Page 18 9 Chapter 18 Optional Voice Adapter Module 18 Figure 18 4 TC 10B Interconnecting Diagram 7833C63 ...
Страница 224: ...Page 18 10 April 1997 TCF 10B System Manual Technologies Inc Figure 18 5 TC 10B Connections for Alarm Circuit 7833C63 ...
Страница 232: ...Page 18 18 April 1997 TCF 10B System Manual Technologies Inc USER NOTES ...
Страница 239: ...January 1996 Page 19 7 Chapter 19 Optional Trip Test Unit TTU 19 Figure 19 4 Transmitter Board 1610C01 ...
Страница 242: ...Page 19 10 January 1996 TCF 10B System Manual Technologies Inc Figure 19 7 Table 19 1 Timing Diagram ...
Страница 243: ...January 1996 Page 19 11 Chapter 19 Optional Trip Test Unit TTU 19 Figure 19 7a Table 19 1a Timing Diagram ...