background image

 

 

 

3.2 LED indication of operating status. 

The PSU is equipped with two diodes on the front panel: 

 

 

 
RED LED: 

 

on – the PSU is supplied with 230V AC  

 

off – no 230V AC supply 

 
GREEN LED: 

 

on – DC voltage in the AUX output of the PSU 

 

off – no DC voltage in the AUX output of the PSU 

 

 

 

 

 

Installation example of the SF116-CRB with batteries and the recorder 

(DVR and accumulators are not included) 

 

 

4.

 

Maintenance.

  

             Any and all maintenance operations may be performed following the disconnection of the PSU from the power supply 
network. The PSU   does not require performing any specific maintenance measures, however, in case of significant dust rate, 
its interior is recommended to be cleaned with compressed air. In case of fuse replacement, use a replacement of the same 
parameters.

 

 
 

 
 
 

 
 

 
 
 

 
 

Содержание SF116-CRB

Страница 1: ...aint with the IEEE802 3af standard Supports auto learning and auto aging of MAC addresses 1K size Space for a recorder with the following dimensions max 400 345 80 W H D LED indication Metal housing c...

Страница 2: ...1 TP G2 TP ports is used for connection of another network device via RJ45 connector The switch is fitted with SFP slots the use of fiber optic module GBIC allows fiber optic transmission The LEDs at...

Страница 3: ...050 3 DC DC50HV converter 4 Output filter in the power circuit of the recorder 5 Tamper terminals of tamper protection NC 6 Space for batteries 4x17Ah 12V 7 Space for a recorder straps for mounting th...

Страница 4: ...dards IEEE802 3 802 3u 802 3x CSMA CD TCP IP Forwarding rate 10BASE T 14880pps port 100BASE TX 148800pps port Bandwidth 1 6Gbps Transmission method Store and Forward Optical indication of operation Sw...

Страница 5: ...should not exceed 192W when all PoE ports are being used The increased demand for power is particularly evident in the case of cameras with heaters or infrared illuminators when launching these featur...

Страница 6: ...PTICAL INDICATION OF THE SWITCH s POWER SUPPLY 1 16 GREE LED LIGHT LINK The connection status of LAN devices 10MB s or 100Mb s and data transmission OFF no connection ON the device is connected 10Mb s...

Страница 7: ...n example of the SF116 CRB with batteries and the recorder DVR and accumulators are not included 4 Maintenance Any and all maintenance operations may be performed following the disconnection of the PS...

Страница 8: ...pment should be disposed of separately from normal household waste The power supply unit is adapted for a sealed lead acid battery SLA After the operation period it must not be disposed of but recycle...

Отзывы: