5.4)
Mount to frames (in front and back) cross profiles, distances and RACK profiles as shown below.
Страница 1: ...d rolled steel SPCC 1 5mm bolted frame cold rolled steel SPCC 1 2mm RAL 9004 welded front door 5mm toughened glass SPCC 1 2mm RAL 9004 hinged side panel cold rolled steel SPCC 1 2mm RAL 9004 removable...
Страница 2: ...rtical 2 pcs 11 Cable gland end cup upper 2 pcs 12 Cable gland end cup lower 2 pcs Num ber Component Amou nt Foto 13 Lock rear door RAZ25 1 pcs 14 Side door distance 4 pcs 15 2 wheel without lock 4 pc...
Страница 3: ...to the grounding in the frame as shown in the drawing 5 2 Mount the top plate and bottom plate to the left and right frames of the RACK cabinet respectively Use M8x12 Head Cap Screws with M8 nuts 16p...
Страница 4: ...5 4 Mount to frames in front and back cross profiles distances and RACK profiles as shown below...
Страница 5: ...5 5 Screw vertical cable management panels to mounted distances 5 6 Installation of front rear and side doors...
Страница 6: ...MANUFACTURER Pulsar sp j Siedlec 150 32 744 apczyca Tel 14 610 19 40 Fax 14 610 19 50 e mail biuro pulsar pl sales pulsar pl http www pulsar pl www zasilacze pl...