2.2. Installation procedure. 

1. Before installation of the power supply unit, make sure that 230VAC power if cut off.  
2. Mount the unit in the intended location.  
3. Connect the 230VAC power cables. Connect the PE cable (yellow-green) to an appropriate PSU 
terminal (marked with 

 - earth symbol). 

 

 

The shock protection circuit shall be performed with a particular care, i.e. the yellow and 
green wire coat of the power cable shall stick to one side of the ‘PE’ terminal. Using the PSU 
without a properly made and fully operational shock protection circuit is UNACCEPTABLE! 
It can cause a device failure or an electric shock. 
 

 

 

4. Connect load/loads to proper output connectors of the power supply (positive pole is marked as +V, 
negative pole as -V) 
5. Connect the technical outputs to the central or other device. 
6. Connect the battery in accordance with the signs (colours). 
7. Once the tests and operation control have been completed, the enclosure/cabinet can be locked. 

 

 

Fig 3. Mechanical view of the PSU. 

 
 
 

 

Содержание PSBOC15512110

Страница 1: ...PSBOC15512110 v 1 0 PSBOC 13 8V 11A OC Caged switched mode buffer power supply unit EN Edition 2nd 19th July 2012 Supersedes edition 1st 10th Mar 2012...

Страница 2: ...lock diagram 1 3 Description of PSU components and connectors 1 4 Specifications 2 Installation 2 1 Requirements 2 2 Installation procedure 3 Operating status indication 3 1 LED indication of operatin...

Страница 3: ...tage 4 FAC AC absence technical output relay type 5 FAC AC absence technical output OC type 6 FPS output indicating DC absence PSU failure OC type 7 FLB output indicating battery low voltage OC type 8...

Страница 4: ...p p max Current consumption by PSU systems 40 mA Battery charging current 1A 4A changed with jumper Short circuit protection SCP electronic automatic recovery Overload protection OLP 105 150 of power...

Страница 5: ...mperature 10 C 40 C Storage temperature 20 C 60 C Relative humidity 20 90 without condensation Vibrations during operation unacceptable Impulse waves during operation unacceptable Direct insolation un...

Страница 6: ...green wire coat of the power cable shall stick to one side of the PE terminal Using the PSU without a properly made and fully operational shock protection circuit is UNACCEPTABLE It can cause a devic...

Страница 7: ...the relay contacts after approx 10 seconds CAUTION In Fig 2 the contact set in the potential free status corresponds to a state with no AC power AC power failure FPS technical output indicating absenc...

Страница 8: ...ect 6 Should the claim be accepted the manufacturer is obliged to provide warranty repairs at the earliest convenience however not later that within 14 days from the delivery to the service centre of...

Отзывы: