Pulsar PSBEN 3024C/LCD Скачать руководство пользователя страница 10

www.pulsar.pl   

 

 

 

PSBEN3024C/LCD 

 

 

  

 

BLACK POWER

 

 

 

10 

 - EXT IN; input of collective failure. 
5.  With  the 

I

BAT

  jumper  determine  the  maximum  battery  charging  current,  in  accordance  with  the  battery 

parameters.  
6. With the 

P

BAT

 jumper determine if the discharged battery disconnection system U<20V (+/-5%) shall be on or off. 

The battery protection is on when the P

BAT

 jumper is off.

 

7. Switch on the ~230V AC supply (red AC diode and green AUX diode should be on). 
8.  Check  the  output  voltage  (the  PSU  voltage  without  load  and  without  battery  should  amount  to 

27,5V ÷ 27,7V, 

with  a  battery  or  during  battery  charging  process:  22

V÷27,6V).  If  the  value  of  the  voltage  requires  adjustment,  it 

should be set with use of the V

ADJ

 potentiometer, monitoring the voltage at the AUX output of the PSU. 

9. Connect the batteries in accordance with the markings: +BAT red to 'plus',  -

BAT black to 'minus’. The LB diode 

should be on during battery charging process. 
10. Press the STOP button to activate or deactivate a dynamic battery test. Deactivating the test turns out the PSU 
failure  indication  at  the  APS  FLT  output,  but  it  does  not  affect  the  protection  system  against  complete  battery 
discharge. 
11. Check the current consumption of the receivers, taking into account the  battery charging current, so as not to 
exceed the total current efficiency of the PSU. 
12. Once the tests are completed, close the PSU cover. 
 
        

Table 3. Operation parameters. 

Environmental class 

II 

Operating temperature 

-

10ºC...+40ºC 

Storing temperature 

-2

0ºC...+60ºC 

Relative humidity 

20%...90%, no condensation 

Sinusoidal vibrations during operation 

EN 50130-5 

Surges during operation 

EN 50130-5 

Direct insolation 

unacceptable 

Vibrations and surges during transport 

PN-83/T-42106 

 
 
         

Table 4. Factory settings of the PSU. 

Indication time of EPS network loss

 

5s 

section 5.6 

Battery charging current 

1A 

section 7.5 

Battery presence 

YES (battery present) 

section 7.6 

Battery test 

ON

 

  section 6.2.2 

section 7.3 

Deep discharge battery protection UVP 

ON

 

section 7.2 

Acoustic indication 

ON 

section 5.5 

Communication address

 

section 6.2.5 

Transmission

 

115.2k 8E1 

section 6.2.6

 

Highlighting

 

Constant 

– 50%

 

section

 6.3.4 

Blinking light indicating failure 

ON 

section

 6.3.6 

Passwords: 

 

user’s 

 

installer’s

 

 

- keyboard lock 

 
1111 
1234 
NO 

section

 6.1 

 

Содержание PSBEN 3024C/LCD

Страница 1: ...PSBEN 3024C LCD v 1 1 PSBEN 27 6V 3A 2x17Ah EN LCD Buffer switch mode power supply unit EN Edition 5 from 18 06 2014 Supercedes edition 4 from 01 02 2013 LCD Version...

Страница 2: ...STIC INDICATION 19 5 6 TECHNICAL OUTPUTS 19 5 7 INPUT OF COLLECTIVE FAILURE EXT IN 20 5 8 ENCLOSURE TAMPER INDICATION TAMPER 21 5 9 OVERVOLTAGE PROTECTION OF THE PSU OUTPUT OVP 21 5 10PSU OVERLOAD 21...

Страница 3: ...ERY 35 8 REMOTE MONITORING OPTIONS WI FI ETHERNET RS485 USB 36 8 1 COMMUNICATION VIA THE USB TTL INTERFACE 36 8 2 ETHERNET NETWORK COMMUNICATION 36 8 3 THE WI FI WIRELESS COMMUNICATION 37 8 4 RS485 NE...

Страница 4: ...d reverse polarity connection jumper selectable battery charging current 0 2A 0 6A 1A 1 5A remote battery test additional module required START button for battery activation STOP button for disconnect...

Страница 5: ...re YES YES No battery charge YES YES Low output voltage YES YES High output voltage YES YES PSU failure YES YES Surge protection YES YES Short circuit protection YES YES YES YES Overload protection YE...

Страница 6: ...n power source are reported to the Alarm Receiving Centre ARC in accordance with 9 2 EN 50131 1 standard Output voltage 0 28A 1 5A battery charge General use if the PSU is not mounted in an installati...

Страница 7: ...dication off Caption jumper on jumper off VADJ potentiometer DC voltage adjustment BUZZER acoustic indicator FBAT fuse in the battery circuit Connectors AC AC power input BAT DC power battery output A...

Страница 8: ...t no Description Insolation transformer PSU board see Tab 1 fig 2 TAMPER micro switch contacts of tamper resistance NC FMAINS fuse in the supply circuit 230V AC L N power supply connector 230V AC PE p...

Страница 9: ...m 1 Mount the PSU in a selected location It is particularly important to bolt the tamper grip to the mounting surface The grip is located in the central part of the enclosure see fig 3 7 and guarantee...

Страница 10: ...the PSU failure indication at the APS FLT output but it does not affect the protection system against complete battery discharge 11 Check the current consumption of the receivers taking into account...

Страница 11: ...ntering the overview menu mode red LED indicating the presence of AC voltage green LED indicating power at the AUX output of the PSU red LED indicating the PSU failure 5 2 First run of the PSU languag...

Страница 12: ...symbols Screen field Operating status Failure status Blinking FAIL message Information about the current voltage and power consumption at the AUX output The parameter which value has been exceeded is...

Страница 13: ...www pulsar pl PSBEN3024C LCD BLACK POWER 13 current failures of the PSU see section 5 4 3 parameters of the PSU stored in the memory see section 5 4 4 History of events see section 5 4 5...

Страница 14: ...ry charging indication highlighted battery charging PSU overload indication highlighted PSU overload Sections 5 10 PSU failure indication highlighted PSU failure Sections 5 4 6 5 6 Battery failure ind...

Страница 15: ...of the highest priority If there are more than five failures at the same time use the or buttons to display the next failure 5 4 4 LCD screen history of the parameters To set the screen press the ESC...

Страница 16: ...output current IAUX MIN output current minimum IAUX MAX output current maximum To optimally read and analyze the values shown in the chart it is possible to change the time range on the bottom axis of...

Страница 17: ...appropriate code The codes are divided into two groups marked with the initial letters F or I The codes beginning with the letter F indicate a failure The codes that begin with the letter I indicate...

Страница 18: ...FLT service codes F60 No communication PSU FLT no communication with LCD panel F61 F64 Control panel fail PSU FLT service codes F65 Access unlocked passwords unlocked Table 9 List of PSU message codes...

Страница 19: ...to the open position after a time lag determined in the Delay time for EPS output menu see section 6 2 4 APS FLT output indicating battery failure The output indicates a failure in the battery circuit...

Страница 20: ...e EXT IN input The electrical diagram below shows the way of connecting external devices to the EXT IN input Outputs such as OC open collector relay may be used as a source of the signal Fig 17 Exampl...

Страница 21: ...n of the PSU output OVP In case of voltage exceeding 15 5V 0 5V at the switching regulator s output the system cuts off the power at the outputs to protect the battery and the receivers from damage Th...

Страница 22: ...e password full access to the PSU s settings User s password locked access to the PSU settings menu Table 12 Access ranges PASSWORD Access range Control panel settings PSU settings SERVICE USER Preset...

Страница 23: ...nge it To do this choose a password that will be changed user s password or service password and enter the new one 6 1 3 Disabling the password If the password is not required it can be turned off The...

Страница 24: ...m by pressing the SET button When on the keyboard will be locked automatically if no buttons are pressed within 5 minutes After this time pressing any button on the control panel will display a window...

Страница 25: ...N OFF battery test OFF Section 6 2 2 and 7 3 Battery protection ON battery protection disconnection ON OFF battery protection disconnection OFF Section 6 2 3 Delay time for EPS output Setting the dela...

Страница 26: ...test menu press the SET button the prompt will appear at the end of the line use the or buttons to select ON battery test ON OFF battery test OFF confirm by pressing the SET button Enabling disabling...

Страница 27: ...disconnection ON OFF battery protection disconnection OFF confirm by pressing the SET button 6 2 4 Setting the delay time for EPS output indicating 230V AC power loss The PSU features adjustable delay...

Страница 28: ...tion between the PSU and the computer namely the address parity and speed should have the same settings for both the PSU and the PowerSecurity program Communication address allows to identify power su...

Страница 29: ...ave the same settings for both the PSU and the PowerSecurity program The PSU has preset transmission parameters of 115200 baud 8E1 if these values were changed they should be restored to original sett...

Страница 30: ...y mode the screen will turn off if no buttons are pressed within 5 minute Fig 23 Control panel screen Table 14 The description of the Control panel screen Position Description Language Available langu...

Страница 31: ...the prompt will appear next to the day position use the or buttons to set the current day confirm by pressing the SET button 6 3 3 Setting the time The Time menu in the Control panel menu enables sett...

Страница 32: ...option use the or buttons to change the setting to 5 min press the SET button the prompt will appear at the end of the line use the or buttons to set the required brightness confirm by pressing the S...

Страница 33: ...during failure indication When on the blinking light will indicate a failure use the or buttons to display the Blinking light indicating failure menu press the SET button the prompt will appear at the...

Страница 34: ...e SET button and select PSU Battery protection ON OFF see section 6 2 3 Caution Deactivating of the UVP function is not recommended since a deep discharge of the battery limits its capability of stori...

Страница 35: ...s a battery circuit charged with direct current The current selection is done with use of the IBAT jumpers The table below shows how long does it take to charge a fully discharged battery up to min 80...

Страница 36: ...e power supply unit power supply current consumption used for the calculation of standby time should be taken into account see section 7 4 8 1 Communication via the USB TTL interface The easiest way o...

Страница 37: ...ng against adverse environmental conditions Fig 27 Ethernet network communication using the RS485 INTRE interface 8 3 The Wi Fi wireless communication The Wi Fi wireless communication can be implement...

Страница 38: ...ainst adverse environmental conditions Fig 29 The Wi Fi communication using the RS485 WIFI INTRW interface 8 4 RS485 network communication Another type of network communication is the RS485 communicat...

Страница 39: ...of the program into smaller areas depending on the number of monitored power supplies The program is equipped with manager mode which allows the grouping of power supplies for easier analysis and orie...

Страница 40: ...voltage automatic return AUX disconnection Short circuit protection SCP Electronic current limitation and or FBAT fuse failure in the battery circuit requires fuse replacement Automatic return Overloa...

Страница 41: ...mm 2 Mounting See Fig 3 Battery space 2x17Ah 12V SLA max 380 x 165 x 85mm WxHxD max Net gross weight 6 4 6 9 kg Enclosure Steel plate DC01 1mm color RAL 9005 black Closing Cheese head screw x2 at the...

Страница 42: ...once per year During the inspection check the batteries and run the battery test 4 weeks after installation re tighten all screw connections see Fig 2 9 10 1 Battery replacement of the LCD panel Estim...

Страница 43: ...www pulsar pl PSBEN3024C LCD BLACK POWER 43...

Страница 44: ...the claim be accepted the manufacturer is obliged to provide warranty repairs at the earliest convenience however not later that within 14 days from the delivery to the service centre of the manufactu...

Отзывы: