background image

www.pulsar.pl 

                  HPSB series 

 

 

10 

4.  Maintenance. 

Any and all maintenance operations may be performed following the disconnection of the PSU from the power 

supply  network.  The  PSU      does  not  require  performing  any  specific  maintenance  measures,  however,  in  the  case  of 
significant dust rate, its interior is recommended to be cleaned with compressed air. In the case of a fuse replacement, 
use a replacement of the same parameters.  

 

 

 

 

 

 

WEEE LABEL 

 

Waste electrical and electronic equipment must not be disposed of with normal household waste. 

According to the European Union WEEE Directive, waste electrical and electronic equipment 

should be disposed of separately from normal household waste. 

 

 

CAUTION!

 

The power supply unit is adapted for cooperation with the sealed lead-acid batteries (SLA). After the operation period they must 

not be thrown but recycled according to the applicable law. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

 

 

 

 

 

Pulsar sp. j.  

Siedlec 150,  32-744 Łapczyca, Poland 

Tel.  (+48) 14-610-19-40, Fax. (+48) 14-610-19-50 

E-mail: 

[email protected]

[email protected]

 

http:// 

www.pulsar.pl

www.zasilacze.pl

 

Содержание HPSB Series

Страница 1: ...USER MANUAL EN Edition 1 from 24 11 2020 Supersedes the edition Power supplies HPSB series Buffer switched mode power supply...

Страница 2: ...l indication 4 Maintenance 1 Technical description 1 1 General description Switch mode buffer power supply units HPSB are intended for continuous power supply to devices that require stabilised voltag...

Страница 3: ...utput voltage adjustment 3 Connector to external LED indicators 4 The output of the PSU V V 5 Battery terminals B B 6 L N power supply connector 230V AC protection connector 7 Selection jumper for cha...

Страница 4: ...module models 12V10A 24V5A 48V3A Fig 2d View of power supply module models 12V15A 24V7A Fig 2e View of power supply module models 12V20A 24V10A 48V5A Table 2 View of PSU see Fig 3 Element no Descripti...

Страница 5: ...www pulsar pl HPSB series 5 Fig 3 View of PSU 1 4 Specifications electrical parameters tab 3 mechanical parameters tab 4 operation safety tab 5 operating parameters tab 6...

Страница 6: ...h 17Ah 17Ah 40Ah 65Ah Jumper selectable battery charging current 0 5 A 0 5 A 0 5 A I1 0 5 A I2 1 A I1 1 A I2 2 A I1 1 A I2 4 A I1 2 A I2 4 A I1 2 A I2 4 A I3 8 A Net gross weight 1 1 1 kg 1 3 1 4 kg 1...

Страница 7: ...Jumper selectable battery charging current I1 0 2 A I2 0 5 A I1 0 5 A I2 1 A I1 0 5 A I2 2 A I1 1 A I2 2 A I1 1 A I2 2 A I3 4 A I1 0 5 A I2 1 A I1 0 5 A I2 1 A I3 2 A Net gross weight 1 8 1 9 kg 2 3 2...

Страница 8: ...sation Vibrations during operation unacceptable Impulse waves during operation unacceptable Direct insulation unacceptable Vibrations and impulse waves during transport Wg PN 83 T 42106 2 Installation...

Страница 9: ...circuit is UNACCEPTABLE It can cause a device failure or an electric shock 3 Check output voltage and adjust if necessary using potentiometer see table displaying parameters of the power supply 4 Con...

Страница 10: ...ers WEEE LABEL Waste electrical and electronic equipment must not be disposed of with normal household waste According to the European Union WEEE Directive waste electrical and electronic equipment sh...

Отзывы: