Pulsar HPSB 3524C Скачать руководство пользователя страница 7

www.pulsar.pl

                                                               

HPSB3524C                                                      

GREEN POWER

 

 

 

7

 

RED LED: 

 

on – the PSU is supplied with 230V AC  

 

off – no 230V AC supply  

 

GREEN LED: 

 

on – DC voltage in the AUX output of the PSU 

 

off – no DC voltage in the AUX output of the PSU 

 

 

The shock protection circuit shall be performed with a particular care, i.e. the yellow and 
green wire coat of the power cable shall stick to one side of the terminal - marked with  

 symbol on the PSU enclosure. Operation of the PSU without the properly made and 

fully  operational  shock  protection  circuit  is  UNACCEPTABLE!  It  can  cause  a  device 
failure or an electric shock. 

 
4. Connect the 

receivers’ cables to the terminals V+ (+), V-(-) of the PSU module.  

5. Connect the power (~230V) 
6. Connect the battery (mind the colours):   
- battery output (+V):  BAT+ cable / red, 
- battery output (0V):  BAT 

– cable / GND / black. 

7. Check the PSU operation indicator: green LED. 
8. Check the PSU output voltage: 
- the PSU voltage without load should amount to U=27,6V DC.   
9. After installing and checking proper working, the enclosure can be closed. 
 

 
3. Operating status indication. 

 
3.1 LED indication of operating status. 

The PSU is equipped with two diodes on the front panel:

 

 
 
 
 
 
 

 

 
 
 
4. Operation and use. 

 
4.1 Overload or short circuit of the PSU output (SCP on) 

In case of overload, the output voltage is automatically shut off, and so is the LED indicator. The restoration 

of the voltage takes place immediately after the failure (overload) is over. 

 

4.2 Disconnection of discharged battery. 

     The  PSU  is  equipped  with  the  discharged  battery  disconnection  system.  During  the  battery-assisted 

operation, reducing voltage below 19V at the battery terminals will cause battery disconnection. 

 

4.3 Maintenance. 

Any and all maintenance operations may be performed following the disconnection of the PSU from the 

power supply network. The PSU   does not require performing any specific maintenance measures, however, in 
case of significant dust rate, its interior is recommended to be cleaned with compressed air. In case of fuse 
replacement, use a replacement of the same parameters. 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание HPSB 3524C

Страница 1: ...HPSB 3524C v 1 0 HPSB 27 6V 3A 2x17Ah Buffer switching power supply unit EN Edition 8 from 24 10 2016 Supercedes the edition 7 from 11 08 2 ...

Страница 2: ...ion A buffer PSU is intended for an uninterrupted supply to devices requiring stabilised voltage of 24V DC 15 The PSU provides voltage of U 27 6V DC Current efficiency 1 Output current 3A 0 5A battery charge 2 Output current 2 5A 1A battery charge Total device current battery 3 5A max In case of power decay a battery back up is activated immediately The PSU is constructed based on the switch mode ...

Страница 3: ...connectors tab 1 tab 2 fig 2 Element no Fig 2 Description 1 PSU module 2 connectors see tab 2 3 green LED indicates AC power 4 potentiometer output voltage adjustment 5 BAT GND battery outputs BAT red GND black 6 TAMPER contact of sabotage protection NC 7 Additional connector for LED indication 8 Selection jumper for charging current Ibat 0 5A Ibat 1A Legend jumper installed jumper removed Factory...

Страница 4: ...www pulsar pl HPSB3524C GREEN POWER 4 Fig 2 The view of the PSU ...

Страница 5: ...of connection battery Sabotage protection TAMPER output indicating enclosure opening microswitch NC contacts enclosure closed 0 5A 50V DC max LED indication AC diode indicating AC power status AUX diode indicating DC power status at the PSU output red normal status on failure off green normal status on failure off Mechanical parameters tab 4 Enclosure dimensions 400 x 350 x 90 8 mm WxHxD Fixation ...

Страница 6: ...ufficient convectional air flow through ventilating holes of the enclosure Before installation prepare a PSU load balance 1 Output current 3A 0 5A battery charge 2 Output current 2 5A 1A battery charge Total device current battery 3 5A max As the PSU is designed for a continuous operation and is not equipped with a power switch therefore an appropriate overload protection shall be guaranteed in th...

Страница 7: ...amount to U 27 6V DC 9 After installing and checking proper working the enclosure can be closed 3 Operating status indication 3 1 LED indication of operating status The PSU is equipped with two diodes on the front panel 4 Operation and use 4 1 Overload or short circuit of the PSU output SCP on In case of overload the output voltage is automatically shut off and so is the LED indicator The restorat...

Страница 8: ...c equipment should be disposed of separately from normal household waste CAUTION The power supply unit is adapted for cooperation with the sealed lead acid batteries SLA After the operation period they must not be thrown but recycled according to the applicable law Pulsar Siedlec 150 32 744 Łapczyca Poland Tel 48 14 610 19 40 Fax 48 14 610 19 50 E mail biuro pulsar pl sales pulsar pl http www puls...

Отзывы: