Pulsar HPSB 11A12D Скачать руководство пользователя страница 8

www.pulsar.pl                                                        HPSB11A12D                                                    

GREEN POWER

 

 

 

8

 

 

 

 

WEEE LABEL 

 

Waste electrical and electronic equipment must not be disposed of with normal household 

waste. According to the European Union WEEE Directive, waste electrical and electronic 

equipment should be disposed of separately from normal household waste. 

 

 

CAUTION!

 

The power supply unit is adapted for cooperation with the sealed lead-acid batteries (SLA). After the operation period they must 

not be thrown but recycled according to the applicable law. 

 

 
 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 

 

 
 

Pulsar  

Siedlec 150,  32-744 Łapczyca, Poland 

Tel.  (+48) 14-610-19-40, Fax. (+48) 14-610-19-50 

E-mail: 

[email protected]

[email protected]

 

http:// 

www.pulsar.pl

www.zasilacze.pl

 

Содержание HPSB 11A12D

Страница 1: ...HPSB 11A12D v 1 0 HPSB 13 8V 10A 40Ah Buffer switch mode power supply unit EN Edition 8 from 24 10 2016 Supersedes edition 7 from 11 08 2014...

Страница 2: ...rupted supply to devices requiring stabilised voltage of 12V DC 15 The PSU provides voltage of 13 8V DC Current efficiency 1 Output current 10A 1A battery charge 2 Output current 7A 4A battery charge...

Страница 3: ...s and connectors tab 1 tab 2 fig 2 Part no Fig 2 Description 1 PSU module 2 connectors see tab 2 3 green LED indicates AC power 4 potentiometer output voltage adjustment 5 BAT GND battery outputs BAT...

Страница 4: ...www pulsar pl HPSB11A12D GREEN POWER 4 Fig 2 The view of the PSU...

Страница 5: ...ction PTC polymer fuse Surge protection varistors Overvoltage protection OVP 16V activation requires disconnecting the load or supply for about 20 s Excessive discharge protection UVP U 9 5 V 5 discon...

Страница 6: ...stallation 2 1 Requirements The buffer PSU shall be mounted by a qualified installer with appropriate permissions and qualifications for 230V AC installations and low voltage installations required an...

Страница 7: ...V V of the PSU module 5 Connect the power 230V 6 Connect the battery mind the colours battery output V BAT cable red battery output 0V BAT cable GND black 7 Check the PSU operation indicator green LE...

Страница 8: ...c equipment should be disposed of separately from normal household waste CAUTION The power supply unit is adapted for cooperation with the sealed lead acid batteries SLA After the operation period the...

Отзывы: