background image

10 

   

 

 

 

16.

 

Slide Union Nut over Core Tube and tighten onto Body. Do not over tighten, hand tight is sufficient. 

 

17.

 

Slide the solenoid over the Core Tube and secure with Cap Nut. Hand Tight. 

 

 

 

18.

 

Reapply power to the pump and ADV and follow standard startup instructions from IOM supplied 

with pump. 

 

9.3 

 Valve Body and Discharge Valve Assembly Removal 

CAUTION

: Take all precautions to prevent environmental and personnel exposure to hazardous materials. 

Any product being pumped will be released during this procedure. 

 

The O-ring seals used in the check valve and ADV are critical to product containment and pump 

operation.  All o-rings should be inspected carefully and any that show signs of damage or wear 
should be replaced.  The owner may wish to replace these seals any time the ADV assembly is 
removed from the pump. 

1.   Disconnect the power source to the pump drive motor.  If you plan to maintain the ADV itself, remove 

power from the ADV unit.  For maintenance to the check valves only, the ADV need not be 
disconnected. 

2.   Relieve all pressure from the piping system. 

3.

 

Close the inlet and outlet shutoff valves.  

4.

 

Take all precautions to prevent environmental and personnel exposure to hazardous materials. 

Содержание PULSAR HYPOPUMP 25H

Страница 1: ...PULSAR HYPOPUMP2 AUTO DE GAS METERING PUMP Bulletin IOM PSR 1503 Rev B Installation Operation Maintenance Instruction ADDENDUM...

Страница 2: ...back to the originator freight collect Any field modifications will void the Pulsafeeder warranty Out of warranty repairs will be subject to Pulsafeeder s standard bench fees and testing costs associ...

Страница 3: ...eneral Description 6 8 3 Operation of Manual Override Button 6 9 Maintenance 7 9 1 Maintenance Notes 7 9 2 Auto De gas Valve Seal Kit Replacement 7 9 3 Auto De gas Valve Body and Discharge Valve Assem...

Страница 4: ...Notes are general information meant to make operating the equipment easier Tips have been included within this bulletin to help the operator run the equipment in the most efficient manner possible The...

Страница 5: ...You are solely responsible for its use The ADV electrical installation must conform to all relevant electrical codes Installation and electrical maintenance must be performed by a qualified electrici...

Страница 6: ...pump it should not be removed during this period provided the above conditions can be applied to the pump as well If the ADV was shipped in its own carton it should be stored in that carton 4 2 Long...

Страница 7: ...is actuated by a solenoid controlled by a solid state timer The ADV Valve Assembly incorporates a dual sealing design to insure the valve function even if the Primary Bellows seal fails The Leak Dete...

Страница 8: ...on of the ADV as a unit AVOID LOCATIONS WHERE THE ADV WOULD BE SUBJECTED TO EXTREME COLD OR HEAT OR DIRECT SUNLIGHT FAILURE TO OBSERVE THIS WARNING COULD DAMAGE THE ADV AND VOID ITS WARRANTY MINIMUM O...

Страница 9: ...CI protected electrical circuit 1 Remove the enclosure front cover Note The plastic screw hole plugs can be pried out using a flat bladed tool 2 Bring AC power and ground wires into valve assembly enc...

Страница 10: ...opens periodically to allow fluid from the discharge line to bypass the discharge check valve and flow back into the pump head The valve is actuated by a solenoid controlled by a solid state timer Th...

Страница 11: ...lete ADV assembly is available as a repair item 9 2 Auto De gas Valve Seal Kit Replacement NP999130 000 CAUTION Take all precautions to prevent environmental and personnel exposure to hazardous materi...

Страница 12: ...O ring 9 Locate parts from the Seal Kit 10 Install NEW O ring onto core tube lubricate with lubricant that is compatible with product being pumped and reinstall sleeve over Core Tube Locate and remov...

Страница 13: ...product being pumped to the Body O ring and install into Valve Body 13 Install NEW Seal Kit into Valve Body Use care to ONLY push straight into bore 14 Install new spring over Core and check that Sma...

Страница 14: ...procedure The O ring seals used in the check valve and ADV are critical to product containment and pump operation All o rings should be inspected carefully and any that show signs of damage or wear sh...

Страница 15: ...lling the valve assembly 10 Troubleshooting Guide Symptom Probable Cause Possible Solution Pump does not prime product side Purge relay not operational Verify power is present at timing relay Valve no...

Страница 16: ...12 11 Hypo Valve Replacement Instructions Remove the front cover from the old Hypo valve enclosure...

Страница 17: ...the incoming power to the old valve Loosen or remove the tie bar nuts and lift the valve cap to remove the hypo valve assembly As you remove the assembly remember to support the check valve so it does...

Страница 18: ...14 Remove the check valve assembly...

Страница 19: ...in three pieces the valve body assembly with the solenoid the electrical enclosure and the O ring package The solenoid and the electrical enclosure are prewired Remove the front cover to expose the wi...

Страница 20: ...16 Remove the two nuts lock washers and flat washers Remove the plastic cover from the end of the gearbox...

Страница 21: ...e existing top two holes in the rib of the gear box will line up with the holes in the electrical enclosure Use a 3 0 mm Allen wrench to tighten the mounting screws and a 9 mm open end wrench for the...

Страница 22: ...18 Wire the Hypo Valve AC power per the wiring diagram Replace the front cover Install the top O ring to the valve body...

Страница 23: ...19 Install the lower O ring to the valve Note a small amount of light grease applied to the O rings will help keep them in place during installation Insert the check valve assembly into the valve body...

Страница 24: ...20 Insert the new hypo valve Replace the valve cap and tie bar...

Страница 25: ...ie bar hardware Apply even pressure to the Tie Bar to align the parts and next tighten the tie bar nuts Tie bar bolts are tightened to 10 in lb of torque and additional tightening may be required to s...

Страница 26: ...22 Install the 4 screw dust caps to the front cover of the electrical enclosure Complete...

Страница 27: ...ULSAR HYPOPUMP2 AUTO DE GAS METERING PUMP Bulletin PS IOM HYPO2 0111 B A unit of IDEX Corporation 2883 Brighton Henrietta Town Line Road Rochester NY 14623 1 585 292 8000 www pulsa com pulsa idexcorp...

Отзывы: