5.3 Wiring Service and Load Connections
Caution: Installation shall be completed per all NEC and Local Codes. Do not install
PTS90
4
23
Systems before reading and understanding all specifications and
installation guides provided. Installation should be performed by a qualified installer.
5.3.
1
Wiring to be done in accordance with NEC and Local Jurisdictions Cod
e.
5.3
.2
Wire the Service
G
round to the internal ground bar
5.3
.3
Wire the Service
Neutral
to Neutral
bar
connection according to use and Local
Jurisdictional Code.
5.
3
.4 If wiring for Service Entrance, ensure that the provided
bond
strap is connected
between the internal ground bar and neutral bar
, and label accordingly.
5.
3
.
5
Wire the Service Feed to the
right side
(service side)
of the Main Breaker (s)
5.
3
.
6
Land Equipment ground to ground bar
5.
3
.
7
Land Equipment Neutral to Neutral bar
5.
3
.
8
Land Load feeds to
the right side (load side)
of load breaker(s)
5.
3
.
9
Ensure connections are properly seated in set screw capture ring openings prior to
tightening per specifications.
5.
3
.
10
Tighter per breaker and bar specifications