4.2 Mounting enclosure to Pole, Stanchion or Round Surfaces 

4.2.1 Customer is responsible to identify suitable location for mounting

 

4.2.2 

Install Pole Straps and tighten per specifications -or - 

4.2.3 Mark and drill anchors locations using template  provided.

 

4.2.4 

Wood Poles should be Lag Bolted or Through Bolted 

4.2.5 

Fiberglass or Metal pole shall be strap mounted

4.2.6 Torque to mounting hardware specifications.

 

  Figure 

3

: Mounting Configuration for enclosure on a 

Pole, 

S

tanchion or Round Surface

 

  www.pactechsol.com

www.pactechsol.com

/ATTVendor

  

Содержание PTS90123 Series

Страница 1: ...ain Breaker with External Rotary Disconnect Switch Suitable for Use as Service Equipment Small Cell Pico Micro CRAN or Macro INSTALLATION GUIDE Compact 120V AC Power Distribution Load Center 60AMP Mai...

Страница 2: ...1 Steps to Inspect and Remove 9 4 0 Mounting 9 4 1 Mounting Bracket 9 4 2 Mounting to Pole Stanchion or Round Surfaces 10 Figure 3 Mounting Example 11 4 3 Mounting to flat surfaces 11 Figure 4 Mounti...

Страница 3: ...C Power Distribution Load Centers provides a custom factory fully assembled load center for Small Cell and CRAN deployments PTS90123 Small Cell AC Power Distribution Load Center Figure 1 PTS90123 The...

Страница 4: ...Installation shall be completed per all NEC and Local Codes Do not install PTS90123 Systems before reading and understanding all specifications and installation guides provided Installation should be...

Страница 5: ...awg Cu Al Rated Conditional Short 10kAIC SPD Dual MOV L N N G 20Ka 8 20us Nominal External Ground Connection 2 hole 20 w 5 8 spacing Physical Housing Material Powder Coated Aluminum Breaker Access Thu...

Страница 6: ...er 12 AMP PT KM1N 16A UL489A DIN rail Breaker 16 AMP Torque Recommendations Main QOU Breaker 42 47 in lbs Load Breaker 17 22 in lbs Surge Protection 17 22 in lbs Neutral Block and Bar 24 27 in lbs Gro...

Страница 7: ...reading and understanding all specifications and installation guides provided Installation should be performed by a qualified installer www pactechsol com www pactechsol com ATTVendor Drawing above s...

Страница 8: ...sub tending branch panel when modernizing or expanding existing sites 2 0 Features The PTS90123 Series of Small Cell AC Load Centers packaged as a custom configuration ready for install in new and exp...

Страница 9: ...ding and understanding all specifications and installation guides provided Installation should be performed by a qualified installer 4 0 Mounting The PTS90123 Systems are certified for outdoor install...

Страница 10: ...ocation for mounting 4 2 2 Install Pole Straps and tighten per specifications or 4 2 3 Mark and drill anchors locations using template provided 4 2 4 Wood Poles should be Lag Bolted or Through Bolted...

Страница 11: ...ing enclosure on flat surfaces 4 3 1 Customer is responsible to identify suitable location for mounting 4 3 2 Mark and drill anchors or clips to secure enclosure to surface 4 3 3 Torque to mounting ha...

Страница 12: ...ction Points 5 1 4 Review Neutral Connection points 5 2 Wiring Ground Connections 5 2 1 Ensure enclosure is grounded as per NEC and Local Jurisdictions Code requirements 5 2 2 If Using for Service Equ...

Страница 13: ...al ground bar 5 3 3 Wire the Service Neutral to Neutral bar connection according to use and Local Jurisdictional Code 5 3 4 If wiring for Service Entrance ensure that the provided bond strap is connec...

Страница 14: ...6 Standard Wiring Practice Example Caution Installation shall be completed per all NEC and Local Codes Do not install PTS90123 Systems before reading and understanding all specifications and installa...

Страница 15: ...Front Access Plate set screw and tighten 5 4 3 Check to ensure all breakers are sitting square in the dead plate opening 5 4 4 Check to ensure all blank breaker positions are covered Caution Installa...

Страница 16: ...ems before reading and understanding all specifications and installation guides provided Installation should be performed by a qualified installer 5 5 1 If installed as Service Equipment apply the SER...

Страница 17: ...on verifying that all is in accordance with this document NEC and local Codes Caution Installation shall be completed per all NEC and Local Codes Do not install PTS90123 Systems before reading and und...

Страница 18: ...ooleen Date 06 05 2018 File Location www pactechsol com Revision Control Issue Number 10 Date 09 05 2018 Description PTS90123Series Installation Guide Prime Contact 1 Name UID Phone Department Respons...

Отзывы: