PTS 90
123
Series Small Cell
AC Power Distribution Load Centers
Installation Guide
1
0
All Rights Reserved, 2018
888-820-3508
3.0 Inspecting and Unpacking of PTS90
123
Series Load Centers
3.0.
1
Inspect the packaging for obvious signs of rough handling and/or external damage.
3.0.
2
Review Installation Guide.
3.0.
3
Remove from plastic packaging.
Caution: Installation shall be completed per all NEC and Local Codes. Do not install
PTS90
123
Systems before reading and understanding all specifications and
installation guides provided. Installation should be performed by a qualified installer.
4.0 Mounting
The PTS90
123
Systems are certified for outdoor installations This section provides
installations guidelines to insure the appropriate requirements are met.
4.1 Mounting Bracket
4.1.1 A mounting bracket is included and pre-installed with the enclosure and can be used
as a template, or the mounting bracket detail on page 4 can be used, if preferred.
4.1.2 If mounting bracket is removed, a lock-tite like adhesive should be applied to the
screws when replacing.