Confidential - PSION INDUSTRIAL PLC
Workabout MX Service Manual
18
Version 1.0
Re-assembly Instructions
The Workabout can be re-assembled by following the flow diagrams below.
The flow diagrams show the correct sequence for re-assembling the subassemblies. Also
refer to the diagrams in the
Dismantling Procedure
steps on page 13, in reverse order, as you
perform each re-assembly step.
Take care when you reinsert FFCs into ZIF Connectors. If you insert FFCs into the
connectors at an angle, it can cause open or short-circuits.
Make sure that the bends in the FFCs allow the drawer to open and close correctly.
Re-assembling the Drawer Assembly
1
2
Insert the Piezo and Main Power FFC
assembly.
Insert the Fuse Contacts.
See Notes Step 2 below
3
Fit the SSD Back.
See Notes Step 3 below
4
Fit the 2 securing screws.
5
Insert the Expansion FFC (if fitted).
See Notes Step 5 below
6
Fit a
new
Top Cap Seal.
7
Fit a
new
Piezo Seal.
8
Screw the Top Cap to the Drawer
Assembly.
The Drawer Assembly has now been re-assembled.
9
Apply End Cap labels.
No
Yes
Base machine?
Notes on Drawer Re-assembly
Step 2
Take care when sliding the Piezo tail into the SSD Drawer via the insertion slot.
Содержание Workabout MX
Страница 1: ...Workabout MX Service Manual...
Страница 2: ......
Страница 6: ......
Страница 36: ...Confidential PSION INDUSTRIAL PLC Workabout MX Service Manual 30 Version 1 0...