This option can be installed on either side of your Max Caddy furnace.
It is important to note that this option requires a 60 gallons buffer tank.
For installation on the right hand side, follow steps 1 to 5 of section 1.
For installation on the left hand side, follow steps 1 to5 of section 2.
Section 1
Short bracket
Screw
Step 1: Remove the screw
located on the left of the
assembly as shown on
figure 1. Keep this screw to
install the “short” bracket
supplied in the hardware kit
as per figure 2.
INSTALLATION OF THE HOT WATER LOOP KIT FOR PRE-HEATING OF DOMESTIC
WATER ON THE RIGHT HAND SIDE
Figure 1
Figure 2