PS Engineering
PXE7300 Series IFE System
Installation and Operator’s Manual
200-973-0002
Page 2-7
April 2006
13. Repeat step 10 for COM 2, and other transmitters.
a. Tune Nav 1 to local station and perform a standard VOT test in accordance with 14 CFR 91.171.
b. Note the indicated VOR bearing on both systems.
c. Turn the PXE7300 on and off, and observe any change in the VOR indication that could be attrib-
uted to the PXE7300.
2.8 Final
Inspection
Verify that the wiring is bundled away from all controls and no part of the installation interferes with air-
craft control operation. Move all controls through their full range while examining the installation to see
that no mechanical interference exists. Verify that the cables are secured to the aircraft structure in accor-
dance with good practices, with adequate strain relief. Ensure that there are no kinks or sharp bends in the
cables and coaxial cables. Verify that the cables are not exposed to any sharp edges or rough surfaces, and
that all contact points are protected from abrasion.
Complete logbook entry, FAA Form 337, weight and balance computation and other documentation as
required. Sample text for FAA Form 337 and instructions for continuing airworthiness can be found in
Appendix F.
Return completed warranty registration application to PS Engineering.