Prysmian Channell Aerial Openable Joint Closure Скачать руководство пользователя страница 4

Channell Pty Ltd. PO Box 789, Blacktown NSW 2148 Australia 
Phone : + 61 2 8884 4111  Fax: + 61 2 8814 8841   

7: 

Cable Installation Auxiliary Ports: 

a: 

Single Entry Grommet: 

Figure 10: 

1.  Using scissors cut the 

Grommet to suit the cable 
diameter 

2.  Mark cable as shown 
3.  using a sheath removal 

tool, score cable to sheath 
removal mark, but do not 
remove the sheath 

4.  Push the cable through the 

grommet (from the 
underside of the base) 
making sure that the 
sheath cut mark is about 
10 mm above the top of 
the grommet. 

5.  Secure the cable to the 

cable support bracket using the cable tie supplied. 

6.  Remove cable sheath and joint conductors as per  your normal practices. 

b: 

Multiple Entry Grommet (Lead-ins) 

Figure 11: 

1.  Mark cable 300 mm from open end of cable. 
2.  Using a sheath removal tool, score cable to sheath removal mark, but do not 

remove the sheath 

3.  Push the cable through the grommet (from the underside of the base) making 

sure that the sheath cut mark is about 10 mm above the top of the grommet. 

4.  Secure the cable to the cable support bracket using the cable tie supplied. 
5.  Remove cable sheath and joint conductors as per  your normal practices. 

8: 

Sealing the Closure: 

Figure 12: 

1.  Clean all sealing surfaces and sealing ‘O’ 

ring. 

2.  Check that all entry ports without cables 

installed are sealed with a grommet, (leave 
spare grommets inside the closure). 

3.  Fit sealing ‘O’ring to the base making sure 

that the ‘O’ ring is seated correctly. 

4.  Place closure dome over the joint and on 

to the base. 

5.  Secure the dome to the base using the ‘V’ 

grooved sealing clamp. 

6.  Close the clamp by pushing the open ends 

together using the palm of the hands. 

7.  Secure the clamp using the overcentre 

locking catch. 

Отзывы: