Device Installation
Edge
TM
Multipoint and Quickbridge - Hardware Installation Guide
17
.
Figure 4-7 Ground the Device
Step 12: Power ON the Device
After connecting the PoE Injector and the device using straight-through CAT5e cable plug the power cord into a power
outlet. There is no ON/OFF switch on the device. To power down the unit, unplug the RJ45 connector from the
OUT / POE
port on the PoE injector.
Step 13: Port LED Indicators
When the device is powered on, it performs startup diagnostics. When startup is complete, the LEDs show the device’s
operational state. The LEDs are located on the Ethernet port inside the device enclosure.
: The LEDs will not be visible when the weather-sealing cap is installed.
The LEDs can be seen at the bottom of the Ethernet port. The following table describes the status of LEDs:
Figure 4-8 Port LED Indicators
LED State
Off
On
Status LED
Ethernet link is down
Ethernet link is active
Gigabit LED
Ethernet link is established at
100 Mbps
Ethernet link is established at 1 Gbps
Содержание Edge MP-1015-BS3
Страница 34: ...RecommendedAntennas EdgeTM Multipoint and Quickbridge Hardware Installation Guide 34 Antenna Patterns ...
Страница 36: ...RecommendedAntennas EdgeTM Multipoint and Quickbridge Hardware Installation Guide 36 Antenna Patterns ...
Страница 38: ...RecommendedAntennas EdgeTM Multipoint and Quickbridge Hardware Installation Guide 38 Antenna Patterns ...
Страница 40: ...RecommendedAntennas EdgeTM Multipoint and Quickbridge Hardware Installation Guide 40 Antenna Patterns ...
Страница 42: ...RecommendedAntennas EdgeTM Multipoint and Quickbridge Hardware Installation Guide 42 Antenna Patterns ...
Страница 43: ...RecommendedAntennas EdgeTM Multipoint and Quickbridge Hardware Installation Guide 43 ...