
ProTec Polymer Processing GmbH
Foerdergeraet_FG201-FG206_BA_1v0_2018_en
11
2.3.2 Special operating modes
Comply with settings, service and inspection activities and intervals including information on
replacing parts / subassemblies specified in the operating manual. These activities must
only be performed by specialist authorised personnel.
Inform operating personnel before starting to perform special and maintenance work! Name
supervisors!
Ensure that the maintenance area is as adequately secured as necessary! If the system is
completely switched off during maintenance and repair work it must be secured against
restart:
Lock the main command device and pull out the key
Attach a warning sign on the main switch
Always tighten any loosened screwed connections during maintenance and repair work!
If the removal of safety equipment is required during fitting, maintenance and repair, it
should be reassembled immediately after completing the maintenance/repair work.
Larger single parts and assemblies must be carefully fastened and secured on hoisting gear
during replacement, so that no hazards occur here. Use only suitable and technically
correct hoisting devices and load attachment devices with sufficient load carrying capacity!
Do not stand or work under swinging loads!
When performing installation work above body height use ascending aids and work
platforms provided for this or other safety-related ones. Do not use system parts as
ascending aid! Wear fall protection when working at great heights!
Keep all handles, steps, railings, pedestals, platforms, ladders, etc. free of dirt!
Clean the systems, and especially here connections and screwed joints, before starting
maintenance/repair of oil, fuel or cleaning materials! Do not use any aggressive cleaning
agents! Use lint-free cleaning cloths!