ProSpot Fitness FUSION HG-5 Скачать руководство пользователя страница 5

 

-- 5 --

Instructions for Assembly of the

 

ProSpot

fitness®

 

HG-5 (con’t.)

 

 

Step #3 FINAL FRAME ASSEMBLY 

 
 
1.  Now according to Diagram 3 install the Middle Cross Brace (18) using M10*65 Bolts (100), M10 Washers 

(70 and M10 Nuts (82). 

 
2.  Next find the Front Top Rail (27) and attach the Front Panel Tabs (49) to the back of the Rail using Pan 

Head Bolts M4*10 (118) & M4 Washers. Make sure the Tabs are facing downward. 

 
3.  Now install the Front Top Rail (27) using M12 x 105 Bolts (74), M12 Washers (20) and M12 Nuts (73). 
 
4.  Now according to Diagram 1 attach the Cable Head assemblies (24) to each Front Upright Post (6) using 

M12*70 Bolts, M12 Washers and M12 Nuts.   

 
5. 

Installation of Weight Bar Cables (128 & 129):

 Uncoil the Cables coming out of the Locking Posts.   Make 

sure the Bar Cables are untwisted all the way down to the pulleys on the Locking Blocks (54, 55). Now feed 
the Cables up and over the Small Double Groove Pulley (114). Then pull down the Rear Cable Knuckle and 
attach to the Right and Left Base Rails (1, 2) using M12*100 Bolt (80), two Spacers (131), two M12 Washers 
(72) and M12 Nuts (73) on each side.  Make sure cables run outside the brace on the Locking Posts. 
Reference Diagrams 7. 

 

6.  According to Diagrams 7 the rear cable knuckles part of the Weight Cables (128 & 129) when installed 

should face towards the Locking Posts (7, 8). Now plug in the single plug of the Locking Post Wire Harness 
(155) into the socket connection on the Rear Cable Knuckles on each side. 

 
7.  To finish the Weight Bar Cable installation take the Front Cable Knuckle that are hanging out of the top of 

each post 

and flip the cables forward toward the front of the unit between the Linking Plates over the double pulley just 

installed.

 

 
8.  Reference Diagrams 3, 7 & 11. The next step is to install the Double Groove Pulleys (112) with Right & Left 

Weight Bar Support Brackets (32 & 33) in each Upper Linking Plate assembly towards the front of the unit 
using M10*105 Bolts (103), M10 Washers (70) and M10 Nuts (82). Make sure the Weight Bar Cables (128 & 
129) are untwisted all the way down into the Locking Post to the pulleys on the Locking Blocks (54 & 55). 
Then lay the cables toward the front of the unit between the Linking Plates over the Double Pulley (112) to 
be installed. 

 

9.  Now install the two Cable Keeper M6*90 Bolts (109), M6 Washers (110), M6 Lock nuts (111) in the Upper 

Linking Plate assemblies above the two rear Double Groove Pulleys (114). These bolts prevent the Weight 
Bar Cables from jumping off the pulleys during workout.  

 
9.  Next according to Diagram # 1 & 2, place the Electronic Box (101) on the Bottom Panel (4) so that the lights 

are facing up and power plug of the Box receptacle is facing toward the back of the unit. Plug in Cross Brace 
wire Harness (108) to each of side Electronic Box (101). Now place the Electronic Box Cover (56) over the 
Electronic Box (101) and attach with two M10*95 Bolts (157), four M10 Washers (70) and two M10 locknuts 
(82).  

 
10.  Now its time to tighten all the bolts previously installed. Starting at the bottom of the unit working your way to 

the top, tighten bolts securely but do not over tighten.

 

 

11.  As shown in Diagram 2 feed the Power Supply Cord (102) thru the Rear Support Post into Electronic Box 

(101). Next plug Power Adapter into Surge Protector Power Strip. Once it is plugged in the green light 
should flash about once every second. 

 
12.  As shown in Diagram 2 feed the Neon power cord thru the Rear Support Post and connect to the Neon Light 

wire harness. Then plug in the Neon Power Cord (155) into Neon Power supply (154). Next plug Neon 
Power Cord (155) into a Surge Protector Power Strip. The Neon Light should turn on. If light does not turn 
on, check wiring. 

 
 

Содержание FUSION HG-5

Страница 1: ......

Страница 2: ...2 Periodic Maintenance of your PROSPOTfitness Product 23 Parts List 24 25 Trouble Shooting 26 28 Warranty Contact Information 29 Note this unit consists of six total boxes Three Boxes Labeled Box 1 3...

Страница 3: ...djustable wrench Metric Socket Set Philips Screw Driver Pliers Scissors and or Razor knife Floor Padding such as cardboard to avoid scratching your floor during assembly Carefully remove parts from pa...

Страница 4: ...fully tighten bolts at this time 5 Now place the Right Left Locking Posts on the Bottom Base Rails 1 2 and secure with M10 20 Bolts 71 and M10 Washers 70 Be careful not to crush wire harnesses at bott...

Страница 5: ...next step is to install the Double Groove Pulleys 112 with Right Left Weight Bar Support Brackets 32 33 in each Upper Linking Plate assembly towards the front of the unit using M10 105 Bolts 103 M10 W...

Страница 6: ...r Try lowering and raising the Weight Bar to the furthest points If it sticks or doesn t work correctly check the Weight Bar Cables over the pulleys to make sure they are not crossed or twisted Accord...

Страница 7: ...elcro Cover in place and wrap around the back keeping the cover tight Do not over stretch Mesh material this will cause wrinkles 4 As shown in Diagram 10 install the Front Plastic Panel 152 5 As shown...

Страница 8: ......

Страница 9: ......

Страница 10: ......

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ...dizziness or shortness of breath and consult your physician 3 Keep small children and others at a safe distance from all moving parts The up and down movement of the weights can be dangerous Never all...

Страница 19: ...the movement of the barbell Do not allow the barbell to swing against the machine frame as this may cause damage to the finish Do not attempt to throw or slam the barbell attached to the cables as thi...

Страница 20: ...rcises use the Lat Leg Down Bar Insert the Left and Right Lat Leg Adjustable Tube in each Cable Head receiver and lock into place with Pop Pin Place Lat Leg Down Bar in notches on Adjustable Tubes Get...

Страница 21: ...he machine grab the Weight Bar place knees on belt and lower body and perform exercise Caution Be careful not to fall off Stability Ball Exercises This unit has been provided with a 24 Stability Ball...

Страница 22: ...ur ankle 9 Next adjust each Leg Developer into the Leg Curl position by pulling the Pop Pin on the adjuster Plate and lock into one of the top two holes 10 Lay flat on Bench hook your legs under leg r...

Страница 23: ...vironments Outdoor use is not recommended and will void the warranty Carefully inspect machine before each use to determine that it is free from defects Do NOT use the machine if you find 1 A loose br...

Страница 24: ...eight Stack Pin 2 23 Right Foot Plate 1 69 Backing Plate w Panel hook 2 24 Cable Head assembly 2 70 Flat Washer M10 130 25 Screw Down Pull Pin 1 71 Hex Head Bolt M10 20 28 26 Upper Linking Plate 4 72...

Страница 25: ...Post Wire Harness 2 152 Front Plastic Panel 1 108 Cross Brace Wire Harness 2 153 Plastic End Cap 6 109 Hex Head Bolt with Sleeve M6 90 4 154 Neon Power Supply 1 110 Flat Washer M6 14 155 Power Cord 1...

Страница 26: ...ioning of wall receptacle Test plug for power a If bad find new 110V AC power supply b Check surge suppressor plug strip for proper function 2 Check wall transformer connection to Electronic Box Shoul...

Страница 27: ...in or out Then tighten screws You may have to hold Bracket in place while tightening screws Most of time this Bracket will need to be adjusted go inward 5 Trigger Sensor and test for 10 12 volts at S...

Страница 28: ......

Страница 29: ...you have any questions about performance under this limited warranty please write us at PROSPOTfitness Inc Attn Warranty Service 2000 Newpoint Pl Pkwy Suite 500 Lawrenceville GA 30043 Office 770 446...

Отзывы: