background image

MT-3109 AC/DC Digital Clamp Multimeter

 

  Hold the Meter tight and press the lever to open the 

transformer jaw. Center the conductor within the transformer 
jaws, then release the Meter slowly until the transformer jaw is 
completely closed. Make sure the conductor to be tested is 
placed at the center of the transformer jaw, otherwise it will 
cause +1 .0% deviation based on the stated accuracy. 

  Remove the transformer jaw. 

  Press RELA to display zero. 

  Repeat the above 1. procedure. 

  The obtained reading will be more precise. 

 
l. AC Current 

 Range 

Resolu
-tion 

Accuracy Frequency 

Response 

Overload 
protection 

40.00A 0.01A +(3%+8) 
400.0A 0.1A  +(3%+5) 

50Hz ~ 
60Hz 

400A 
DC/AC 

 Warning 

The operating temperature must be O

 ~40

 when measuring 

current. 
Remark: 

  It may have 10 digits or less unstable or wrong digits, it will not 

affect measurement result. 

  Hold the Meter tight, do now release.    The Hall components 

are very sensitive not only to the magnet but also to heat and 
machines reaction force. Any shock will cause the changing in 
reading in the short time.    Follow the below procedure to 
measure current will be more precise: 

1.  Hold the Meter tight and press the lever to open the 

transformer jaw. Center the conductor within the 
transformer jaws, then release the Meter slowly until the 
transformer jaw is completely closed. Make sure the 
conductor to be tested is placed at the center of the 
transformer jaw, otherwise it will cause +1.0% deviation 
based on the stated accuracy. 

2.  Remove the transformer jaw. 
3.  Press RELA to display zero. 
4.  Repeat the above 1. procedure. 
5.  The obtained reading will be more precise. 

19 

Содержание MT-3109

Страница 1: ...al Clamp Multimeter User s Manual 1 st Edition 2011 2011 Copy Right by Prokit s Industries Co Ltd 99 Washington Street Melrose MA 02176 Phone 781 665 1400 Toll Free 1 800 517 8431 Visit us at www Test...

Страница 2: ...rload protection The Meter can not only measure AC DC Voltage AC DC Current Frequency Duty Cycle Resistance Diodes Continuity but also it has Data Hold Sleep Mode and Relative Mode features Unpacking...

Страница 3: ...case is removed Look for cracks or missing plastic Pay attention to the insulation around the connectors Inspect the test leads for damaged insulation or exposed metal Check the test leads for contin...

Страница 4: ...e continuity and diode Replace the battery as soon as the battery indicator appears With a low battery the Meter might produce false readings that can lead to electric shock and personal injury When s...

Страница 5: ...nforms to Standards of European Union The Meter Structure see figure 1 4 1 Input Terminals 2 LCD Display 3 Functional Buttons 4 Rotary Switch 5 Trigger press the lever to open the transformer jaw 6 Ha...

Страница 6: ...Below table for information of functional button operations Button Operation Performed HOLD Press HOLD to enter the Hold mode in any mode the Meter beeps Press HOLD again to exit the Hold mode the Met...

Страница 7: ...ing Sleep Mode press and hold SELECT to turn the Meter on it will disable the Sleep Mode feature The Effectiveness of Functional Buttons Not every functional buttons can be used on every rotary switch...

Страница 8: ...tomatically selects the range with the best resolution 5 Test of diode 6 The continuity buzzer is on 7 Indicator for Duty 8 Data hold is active 9 Indicator for REL mode 10 K M Ohm The unit of resistan...

Страница 9: ...ows 1 Insert the red test lead into the Hz Duty V terminal and the black test lead into the COM terminal 2 Set the rotary switch to DC measurement mode and auto ranging is a default 3 Press SELECT to...

Страница 10: ...3 Connect the test leads across with the object being measured The measured value shows on the display Note To obtain a more precise reading you could remove the objects being tested from the circuit...

Страница 11: ...obtain a more precise reading you could remove the objects being tested from the circuit when measuring When diode testing has been completed disconnect the connection between the testing leads and th...

Страница 12: ...ges to the Meter from electric shock do not attempt to measure voltages higher than 600V AC DC although readings may be obtained The resistance ranges are 10Hz 100Hz 1kHz 10kHz 100kHz 1MHz and 10MHz T...

Страница 13: ...t the test leads across with the object being measured The measured value shows on the display Note When duty cycle measurement has been completed disconnect the connection between the testing leads a...

Страница 14: ...rrent measurement has been completed disconnect the connection between the conductor under test and the jaw and remove the conductor away from the transformer jaw of the Meter Sleep Mode To preserve b...

Страница 15: ...the display Note For testing the capacitor with polarity connect the red clip to anode black clip to cathode instead of using test leads as mentioned above To minimize the effect of capacitance stored...

Страница 16: ...viation based on the stated accuracy Max Jaw Size 30mm diameter Projected Max Current conductor size 30mm diameter Electro Magnetic When carrying out measurement near the electro magnetic it may cause...

Страница 17: ...on 400 0mV 0 1mV 1 3 4 000V 1mV 40 00V 10mV 400 0V 100mV 1 1 600V 1V 1 5 600V DC AC Remarks Input impedance 10M B_ AC Voltage Range Resolution Accuracy Overload protection 4 000V 1mV 40 00V 10mV 400 0...

Страница 18: ...d protection 1mV Display forward voltage drop nearest value 600Vp Remark Open circuit voltage approximate 1 48V E Continuity Test Range resolution accuracy Overload protection 100m Around 50 The buzze...

Страница 19: ...DC Current Range Resolution Accuracy Overload protection 40 00A 0 01A 2 5 5 400 0A 0 1A 2 5 3 400A DC AC Warning The operating temperature must be 0 40 when measuring current Remark If the reading is...

Страница 20: ...O 40 when measuring current Remark It may have 10 digits or less unstable or wrong digits it will not affect measurement result Hold the Meter tight do now release The Hall components are very sensiti...

Страница 21: ...air or service your Meter unless you are qualified to do so and have the relevant calibration performance test and service information To avoid electrical shock or damage to the Meter do not get water...

Страница 22: ...circuit being tested before opening the case bottom To replace the battery figure 11 1 Turn the Meter off and remove all the connections from the input terminals 2 Turn the Meter s front case down 3...

Страница 23: ...MT 3109 AC DC Digital Clamp Multimeter 35 2011 Prokit s Industries Co LTD All rights reserved 2011001 T...

Отзывы: