background image

 

 

 

Proboil descaler guide v1-0a 

 

 

Scan here to 
link to a video 
demonstration 

PRO

BOIL. 

Descaling Guide

 

 
The filter system provided with PROBOIL will help to prevent of the calcification (scaling) of the boiler. However it will be 
required from time to time that the PROBOIL will need to be descaled, drained and refilled to ensure the maximum 
energy efficiency and service life from the product especially in hard water areas. Descaling solutions can be obtained by 
contacting the service agent shown on the label on top of the boiler. 

Ensuring that the filter system is set up correctly and replaced as required will reduce the frequency of descaling 
required. If you are regularly needing to descale the PROBOIL system then you either need to replace the filter more 
frequently or check the bypass setup of the filter system. 

 

  

  

 

WARNING:

 Harmful if swallowed. Irritating to eyes and skin. 

KEEP OUT OF REACH OF CHILREN

Avoid contact with skin and eyes. In case of contact with eyes, rinse immediately with plenty of 
water and seek medical advice. After contact with skin, wash immediately with plenty of water. 
If swallowed, seek medical advice immediately and show this container or label.  

Ingredients: Sulfamic Acid. Country of origin USA. See 

www.proboil.co.uk

 for further 

information and SDS.

 

⚠ 

The descaling chemical is acidic and should only be used and handled as indicated, care should be taken not to 

ingest, expose to skin, clothing or decorative surfaces. Take care when touching all surfaces and when disconnecting or 
connecting hoses they may be hot and or generate steam, you must use personal protective wear to prevent accidental 
scalding. 

 

1.

 

If required, adjust the PROBOIL temperature 
to 80°C (see 

user guide

 for more details). 

Only

 If the boiler is already set to a 

temperature higher than 80°C  then dispense 
at least 1 litre from the boiler using the key 
fob, now allow the boiler to fully fill and 
heat. Once completed then switch off the 
PROBOIL at the front control panel (see user 
guide / 

powering down

 for more details). 

 

2.

 

Wait until the flexible connector (B9) has 
cooled to a safe touch temperature, this may 
take some time. 

3.

 

 Ensure the flexible connector (B9) is 

cool to the touch before proceeding, 
afterwards unscrew by hand the flexible 
connector (B9) from the top of the boiler. 

Wear suitable gloves to ensure your safety.

 

 

 

 

 
 

 
 

 

Отзывы: